Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 03: Design Abstract

Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering, commercial and regulatory, perspective in order to progress the CCS demonstration project at Longannet Power station in Scotland through to construction. The study yielded invaluable knowledge and the resulting material are available for download here. This section of the report provides details on the organisation and management of the design as well as key design information for the End-to-End CCS chain. This includes the following: Organisation of the design teams; The End-to-End Basis of Design; The design life; The End-to-End CCS chain process; Piping and instrumentation diagrams; Plant and site layout drawings for the various sites; Equipment; Plant and equipment specifications; Subsurface engineering design reports; No attempt has been made to generalise design data. All of the design information presented is specific to the ScottishPower Consortium Project and has been presented to provide an insight into the development of the End-to-End CCS solution. The FEED design study was based on the Outline Solution developed by the Consortium prior to FEED. The Outline Solution was a conceptual design for the End-to-End CCS chain that was considered to be technically feasible within the constraints of the knowledge available at the time. It included a series of optioneering studies to identify the preferred design for this particular project. During FEED, the Outline Solution design was developed in greater detail to reduce the cost and technical uncertainty, and consequently reduce the financial, programme and technical risks prior to commencing the implementation stage of the project. It must be stressed that a FEED study is carried out to develop a design to the degree that the technical and programme risks are reduced to the agreed limits to better inform the project cost estimate. The current status is that the design has been progressed as far as is practicable within the time and cost constraints of the FEED study. Specifications and datasheets for major equipment have been developed in order that they can be issued to potential suppliers during the implementation phase of the project. The FEED study identified further activities that cannot be performed at the FEED stage of the project but which have been recorded as actions for further investigation during the implementation stage. The FEED study has advanced the development of the application of CCS technology considerably. Though research and conceptual studies are essential to the development of any new technology, they cannot identify many of the difficult design issues that are identified and addressed during a FEED study. Similarly the progress from FEED to the implementation phase is expected to present further challenges for a project of this novel nature. However, the advantage of a FEED study is that the main issues that could present high cost or programme difficulties or even potential 'show stoppers' should already have been identified and, where possible, addressed. Key decisions and design changes taken during the FEED study are explained in Section 11 of the report. The FEED study indicates that CCS remains technically feasible. The appropriate summary section from the Feed Close Out Report can be downloaded as a PDF (Design.pdf). The main text of the FEED Close Out Report, together with the supporting appendix for this section can be downloaded as PDF files.

Resource type

nonGeographicDataset

Resource locator

http://www.bgs.ac.uk/ukccs/accessions/index.html#item37323

function: download

Unique resource identifier

code

http://data.bgs.ac.uk/id/dataHolding/13606474

codeSpace

Dataset language

eng

Spatial reference system

code identifying the spatial reference system

Additional information source

http://webarchive.nationalarchives.gov.uk/20121217150421/http:/decc.gov.uk/en/content/cms/emissions/ccs/ukccscomm_prog/feed/feed.aspx

Classification of spatial data and services

Topic category

geoscientificInformation

Keywords

Keyword set

keyword value

originating controlled vocabulary

title

GEMET - INSPIRE themes

reference date

date type

publication

effective date

2008-06-01

Keyword set

keyword value

Carbon

originating controlled vocabulary

title

BGS Thesaurus of Geosciences

reference date

date type

revision

effective date

2011

Keyword set

keyword value

NERC_DDC

Geographic location

West bounding longitude

East bounding longitude

North bounding latitude

South bounding latitude

Temporal reference

Temporal extent

Begin position

2010-03

End position

2011-04

Dataset reference date

date type

publication

effective date

2011-04

Frequency of update

notApplicable

Quality and validity

Lineage

ScottishPower began developing the Longannet Carbon Capture and Storage project in 2007 in response to the UK Government’s competition to demonstrate full-scale CCS on power generation in the UK. In the summer of 2009, the ScottishPower CCS Consortium, comprising ScottishPower, National Grid and Shell was formed to further develop this project, which could be one of the world’s first full-scale CCS demonstration plants. In March 2010, the Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what exactly would be required from an engineering, commercial and regulatory, perspective in order to progress the CCS project through to construction.

Conformity

Conformity report

specification

title

INSPIRE Implementing rules laying down technical arrangements for the interoperability and harmonisation of Geology

reference date

date type

publication

effective date

2011

degree

false

explanation

See the referenced specification

Conformity report

specification

title

Commission Regulation (EU) No 1089/2010 of 23 November 2010 implementing Directive 2007/2/EC of the European Parliament and of the Council as regards interoperability of spatial data sets and services

reference date

date type

publication

effective date

2010-12-08

degree

false

explanation

See http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2010:323:0011:0102:EN:PDF

Data format

name of format

PDF

version of format

Constraints related to access and use

Constraint set

Limitations on public access

Constraint set

Limitations on public access

The copyright of materials derived from the British Geological Survey's work is vested in the Natural Environment Research Council [NERC]. No part of this work may be reproduced or transmitted in any form or by any means, or stored in a retrieval system of any nature, without the prior permission of the copyright holder, via the BGS Intellectual Property Rights Manager. Use by customers of information provided by the BGS, is at the customer's own risk. In view of the disparate sources of information at BGS's disposal, including such material donated to BGS, that BGS accepts in good faith as being accurate, the Natural Environment Research Council (NERC) gives no warranty, expressed or implied, as to the quality or accuracy of the information supplied, or to the information's suitability for any use. NERC/BGS accepts no liability whatever in respect of loss, damage, injury or other occurence however caused.

Responsible organisations

Responsible party

organisation name

Department of Energy & Climate Change (DECC)

email address

not available

responsible party role

owner

Responsible party

organisation name

ScottishPower

email address

not available

responsible party role

originator

Responsible party

organisation name

Scottish CCS Consortium

email address

not available

responsible party role

originator

Responsible party

organisation name

ScottishPower CCS Consortium

email address

not available

responsible party role

principalInvestigator

Responsible party

organisation name

British Geological Survey

full postal address

The Lyell Centre, Research Avenue South

EDINBURGH

EH14 4AP

United Kingdom

telephone number

0115 936 3142

facsimile number

0115 936 3276

email address

enquiries@bgs.ac.uk

responsible party role

distributor

Responsible party

organisation name

British Geological Survey

full postal address

The Lyell Centre, Research Avenue South

EDINBURGH

EH14 4AP

United Kingdom

telephone number

0115 936 3142

facsimile number

0115 936 3276

email address

enquiries@bgs.ac.uk

responsible party role

pointOfContact

Metadata on metadata

Metadata point of contact

organisation name

British Geological Survey

full postal address

The Lyell Centre, Research Avenue South

EDINBURGH

EH14 4AP

United Kingdom

telephone number

+44 131 667 1000

email address

enquiries@bgs.ac.uk

responsible party role

pointOfContact

Metadata date

2023-05-24

Metadata language

eng