0eed5c99-f409-4329-a98e-47f496bb88a2
English
ISO/IEC 8859-1 (also known as Latin 1)
dataset
dataset
Environmental Information Data Centre
Lancaster Environment Centre, Library Avenue, Bailrigg
Lancaster
LA1 4AP
UK
info@eidc.ac.uk
pointOfContact
2022-10-31T12:13:02
UK GEMINI
2.3
OSGB 1936 / British National Grid
Locations and characteristics of electricity substations (33 kV or larger), Great Britain, 2018
2022-10-24
publication
https://catalogue.ceh.ac.uk/id/0eed5c99-f409-4329-a98e-47f496bb88a2
10.5285/0eed5c99-f409-4329-a98e-47f496bb88a2
doi:
Lovett, A.A., Sünnenberg, G. (2022). Locations and characteristics of electricity substations (33 kV or larger), Great Britain, 2018. NERC EDS Environmental Information Data Centre 10.5285/0eed5c99-f409-4329-a98e-47f496bb88a2
The data consists of names, types, voltages, constraint status and national grid references for 56,865 electricity substations (33 kV or larger) in Great Britain in 2018. It was compiled from information on individual transmission or distribution network operator websites and interpreted to produce a classification of constraint status (where applicable).
The data set was compiled from information on individual transmission or distribution network operator websites.
The work was funded by the Natural Environment Research Council Award NE/M019713/1. Full details about this dataset can be found at https://doi.org/10.5285/0eed5c99-f409-4329-a98e-47f496bb88a2
Lovett, A.A.
University of East Anglia
enquiries@ceh.ac.uk
author
Sünnenberg, G.
University of East Anglia
enquiries@ceh.ac.uk
author
Professor Andrew Lovett
University of East Anglia
enquiries@ceh.ac.uk
pointOfContact
NERC EDS Environmental Information Data Centre
enquiries@ceh.ac.uk
custodian
NERC EDS Environmental Information Data Centre
enquiries@ceh.ac.uk
publisher
University of East Anglia
enquiries@ceh.ac.uk
owner
Energy Resources
theme
GEMET - INSPIRE themes, version 1.0
2008-06-01
publication
Electricity Substations
Electricity Network
Substation Locations
Electricity Network Capacity Constraints
otherRestrictions
no limitations
otherRestrictions
This resource is available under the terms of the Open Government Licence
otherRestrictions
If you reuse this data, you should cite: Lovett, A.A., Sünnenberg, G. (2022). Locations and characteristics of electricity substations (33 kV or larger), Great Britain, 2018. NERC EDS Environmental Information Data Centre https://doi.org/10.5285/0eed5c99-f409-4329-a98e-47f496bb88a2
textTable
100
English
utf8
utilitiesCommunication
2018-01-01
2018-12-31
-8.648
1.768
49.864
60.861
Comma-separated values (CSV)
NERC EDS Environmental Information Data Centre
info@eidc.ac.uk
distributor
https://data-package.ceh.ac.uk/data/0eed5c99-f409-4329-a98e-47f496bb88a2
Download the data
Download a copy of this data
download
https://data-package.ceh.ac.uk/sd/0eed5c99-f409-4329-a98e-47f496bb88a2.zip
Supporting information
Supporting information available to assist in re-use of this dataset
information
dataset
dataset
Commission Regulation (EU) No 1089/2010 of 23 November 2010 implementing Directive 2007/2/EC of the European Parliament and of the Council as regards interoperability of spatial data sets and services
2010-12-08
The data set was compiled from information on individual transmission or distribution network operator websites. It has not been subject to any verification by these companies and represents an attempt to produce a more consistent list of substation locations and capacity constraints to inform spatial modelling as part of the ADVENT research project. More detailed and up-to-date information is now available on many operator data portals