Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 10: CCS Project Costs Abstract
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering, commercial and regulatory, perspective in order to progress the CCS demonstration project at Longannet Power station in Scotland through to construction. The study yielded invaluable knowledge and the resulting material are available for download here. This section of the report contains the cost estimate for the End-to-End CCS chain for the purposes of providing potential developers of CCS projects with indicative cost information regarding capital expenditure, operating costs and decommissioning/ abandonment costs. One of the key objectives of the FEED phase of the UKCCS Demonstration Competition was to increase the cost certainty for the overall project. During development of the Outline Solution, costs were estimated to an accuracy of -30% to +50%. Through the design and project development across the various Consortium workstreams (as outlined in the previous sections of this report), it has been possible to refine this accuracy and increase the cost certainty of the indicative core capital costs to approximately -12%/+15% accuracy. The appropriate summary section from the Feed Close Out Report can be downloaded as a PDF (CCS project costs.pdf). The main text of the FEED Close Out Report, together with the supporting appendix for this section can be downloaded as PDF files. Note this dataset is a duplicate of the reports held at the National Archive which can be found at the following link - http://webarchive.nationalarchives.gov.uk/20121217150421/http://decc.gov.uk/en/content/cms/emissions/ccs/ukccscomm_prog/feed/scottish_power/ccs_costs/ccs_costs.aspx
nonGeographicDataset
http://www.bgs.ac.uk/ukccs/accessions/index.html#item37330
function: download
http://data.bgs.ac.uk/id/dataHolding/13606481
eng
http://webarchive.nationalarchives.gov.uk/20121217150421/http:/decc.gov.uk/en/content/cms/emissions/ccs/ukccscomm_prog/feed/feed.aspx
geoscientificInformation
publication
2008-06-01
Carbon
revision
2011
NERC_DDC
2010-03
2011-04
publication
2011-04
notApplicable
ScottishPower began developing the Longannet Carbon Capture and Storage project in 2007 in response to the UK Government’s competition to demonstrate full-scale CCS on power generation in the UK. In the summer of 2009, the ScottishPower CCS Consortium, comprising ScottishPower, National Grid and Shell was formed to further develop this project, which could be one of the world’s first full-scale CCS demonstration plants. In March 2010, the Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what exactly would be required from an engineering, commercial and regulatory, perspective in order to progress the CCS project through to construction.
publication
2011
false
See the referenced specification
publication
2010-12-08
false
See http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2010:323:0011:0102:EN:PDF
The copyright of materials derived from the British Geological Survey's work is vested in the Natural Environment Research Council [NERC]. No part of this work may be reproduced or transmitted in any form or by any means, or stored in a retrieval system of any nature, without the prior permission of the copyright holder, via the BGS Intellectual Property Rights Manager. Use by customers of information provided by the BGS, is at the customer's own risk. In view of the disparate sources of information at BGS's disposal, including such material donated to BGS, that BGS accepts in good faith as being accurate, the Natural Environment Research Council (NERC) gives no warranty, expressed or implied, as to the quality or accuracy of the information supplied, or to the information's suitability for any use. NERC/BGS accepts no liability whatever in respect of loss, damage, injury or other occurence however caused.
Department of Energy & Climate Change (DECC)
owner
ScottishPower
originator
Scottish CCS Consortium
originator
ScottishPower CCS Consortium
principalInvestigator
British Geological Survey
The Lyell Centre, Research Avenue South
EDINBURGH
EH14 4AP
United Kingdom
0115 936 3142
0115 936 3276
distributor
British Geological Survey
The Lyell Centre, Research Avenue South
EDINBURGH
EH14 4AP
United Kingdom
0115 936 3142
0115 936 3276
pointOfContact
British Geological Survey
The Lyell Centre, Research Avenue South
EDINBURGH
EH14 4AP
United Kingdom
+44 131 667 1000
pointOfContact
2023-05-24