Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 10: CCS Project Costs Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 09: Environment and Consent

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 09: Stakeholder Profiling Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 02: FEED Cost Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Processed side scan data from North Norfolk Sandbanks and Saturn Reef SAC

Processed side scan data from North Norfolk Sandbanks and Saturn Reef SAC (CEND 22/13). The survey at the North Norfolk Sandbanks and Saturn Reef Site of Community Interest (NNSB SCI) was carried...

Azores processed theoretical waveforms (NERC grant NE/N011791/1)

Theoretical waveforms computed to study earthquakes in the Azores archipelago. Grant abstract: How do earthquakes happen? Understanding the nature of earthquakes is a key fundamental question in...

UKCCSRC Call 2 Project: Process-performance indexed design of task-specific ionic liquids for post-combustion CO2 capture

Increased population and increased economic activity have one important thing in common: increased energy demand. More and more, concern is mounting surrounding the broader environmental impact...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 11: Lessons Learned Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Sub bottom profiler processed data from Anton Dohrn and East Rockall Bank

Sub bottom profiler processed data from Anton Dohrn and East Rockall Bank (2009_07-RVFranklin-AntonDhorn-RockallBank). The cruise 2009_03_MV_Franklin Surveyed two Areas of Search for offshore SACs...

Processed bathymetry from Inner Dowsing, Race Bank and North Ridge cSAC

Processed bathymetry from Inner Dowsing, Race Bank and North Ridge cSAC (CEND 11/11). This survey, carried out on the Cefas Endeavour research vessel, used acoustic data and ground truthing to...

Size and Performance of the Northern Ireland Food and Drinks Processing Sector, Subsector Statistics, 10 Years Statistics

Data estimates of the size and performance of the Northern Ireland Food and Drinks Processing Sector. Source agency: Agriculture and Rural Development (Northern Ireland) Designation: National...

1992 Institute of Offshore Engineering, Blue Lagoon, Poole Harbour Dorset, Intertidal survey with special reference to Nematostella vectensis

Survey run by the Institute of Offshore Engineering for English Nature (Peterborough). All these records relate to "Sheader, Sheader (1992) - A survey of Blue Lagoon, Poole Harbour, with special...

1992 Institute of Offshore Engineering, Blue Lagoon, Poole Harbour Dorset, Intertidal survey with special reference to Nematostella vectensis

Survey run by the Institute of Offshore Engineering for English Nature (Peterborough). All these records relate to "Sheader, Sheader (1992) - A survey of Blue Lagoon, Poole Harbour, with special...

Processes governing semi-metal - PGE linkage in crustal magmatic systems: opportunities for discovery and recovery (NERC grant NE/L002191/1)

Publications linked to the Grant: Holwell DA, Keays RR, McDonald I and Williams MR. 2015. Extreme Enrichment of Se, Te, PGE and Au in Cu sulfide microdroplets: evidence from LA-ICP-MS analysis of...

Processed backscatter data from Inner Dowsing, Race Bank and North Ridge cSAC

Processed backscatter data from Inner Dowsing, Race Bank and North Ridge cSAC (CEND 11/11). This survey, carried out on the Cefas Endeavour research vessel, used acoustic data and ground truthing...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 04: End to End CCS Chain Operations Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Processed multibeam bathymetry grids from the Whittard Canyon (JC125, 2015).

Multibeam swath bathymetry data were collected with a hull-mounted Kongsberg EM120 and EM710 echosounder during RRS James Cook cruise JC125 (Chief Scientist Veerle Huvenne) from August-September...

Number of days taken to process Housing Benefit/Council Tax Benefit new claims and change events

Number of days taken to process Housing Benefit/Council Tax Benefit new claims and change events *This indicator is discontinued

NI 181 - Time taken to process Housing Benefit/Council Tax Benefit new claims and change events

The average time taken in calendar days to process all new claims and change events in Housing Benefit and Council Tax Benefit.

UKCCSRC Call 1 project blog: Oxyfuel and EGR Processes in GT Combustion, Update, 01.11.13

This is a blog (Update, 01.11.13) on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion. Grant number: UKCCSRC-C1-26.