Filter by
Remove filters
7,045
results found
- Published by:
- Cabinet Office
- Last updated:
- 19 December 2013
Departmental questionaire to monitor compliance to Government Construction Strategy
- Published by:
- Office for National Statistics
- Last updated:
- 10 May 2014
New Orders in the Construction Industry has now been discontinued as a stand-alone release. Estimates of New Orders along with additional commentary are now included as part of the Output in the...
- Published by:
- Bassetlaw District Council
- Last updated:
- 13 September 2022
The purpose of this feature is to show the location of Housing Monitoring land that is under construction.
- Published by:
- City of York Council
- Last updated:
- 10 November 2021
Bring empty private sector properties back into use
*This indicator has been discontinued.
- Published by:
- Office for National Statistics
- Last updated:
- 26 April 2014
Construction output is a quarterly series of the output of the construction industry in both the private and public sectors.
Source agency: Office for National Statistics
Designation: National...
- Published by:
- Ordnance Survey
- Last updated:
- 10 January 2025
A Road Link is a linear spatial object that defines the geometry and connectivity of a road network between two points in the network. Road Links can represent single carriageways, dual...
- Published by:
- Ordnance Survey
- Last updated:
- 10 January 2025
A Path Link is a linear spatial object that defines the geometry and connectivity of the path network between two points in the network. Path Links will be split for connectivity purposes (for...
- Published by:
- Office for National Statistics
- Last updated:
- 26 April 2014
The release includes an article which presents a method used to estimate a CPI series back to 1950. In addition the estimated series are provided at the all-items and two-digit CPI levels.
Source...
- Published by:
- Ministry of Justice
- Last updated:
- 12 December 2013
The linked data is developmental and is produced from linking existing administrative data sources together to create a new valuable information asset which is being used for a variety of purposes.
- Published by:
- Ordnance Survey
- Last updated:
- 10 January 2025
The Road and Path Networks are not topologically structured together. Connecting Links have been introduced to enable a connection between the Road Network and the Path Network without splitting...
- Published by:
- Health and Safety Executive
- Last updated:
- 19 December 2013
The F10 Database contains details of planned construction projects, provided to HSE by Construction Design Management co-ordinators on those projects. The types of projects that must notify HSE...
- Published by:
- Ordnance Survey
- Last updated:
- 10 January 2025
A Ferry Link is a linear spatial object which represents the connectivity of a vehicular ferry route across a body of water. A Ferry Link will only be captured where both terminals are located...
- Published by:
- Ordnance Survey
- Last updated:
- 20 December 2024
A subsection of the road link geometry that indicates where there is pavement on either side of the road.
Temporal filtering
- Published by:
- Ordnance Survey
- Last updated:
- 10 January 2025
A Railway Link is a linear feature that defines the geometry and connectivity of the Rail Network between two points in the network.
- Published by:
- Natural Resources Wales
- Last updated:
- 14 October 2025
The purpose of the study was to provide information on the types, quantities, origins (by Construction and Demolition sector and geographic region), and fate (management method) of Construction and...
- Published by:
- Natural Resources Wales
- Last updated:
- 31 March 2023
The purpose of the study was to provide information on the types, quantities, origins (by Construction and Demolition sector and geographic region), and fate (management method) of...
- Published by:
- Leeds City Council
- Last updated:
- 04 August 2021
Leeds City Council worked with the University of Leeds to update the case studies in its sustainable design & construction document [Building for Tomorrow...
- Published by:
- London Borough of Hackney
- Last updated:
- 21 March 2017
Areas of linked but separate open spaces and the footpaths between them. Accessible to the public, covers other pedestrian & cycle routes ie not green see LDF Core Strategy Appendix 4
- Published by:
- Bassetlaw District Council
- Last updated:
- 13 September 2022
The purpose of the feature is to show the location of Housing Monitoring land under construction. This data includes land with residential planning permission which is under construction between...
- Published by:
- Department for Business, Energy and Industrial Strategy
- Last updated:
- 20 June 2014
This article reports on work to develop and test improvements to the methodology and reporting of the construction price and cost indices.
Source agency: Business, Innovation and...