Important

We're planning improvements to this service. Help us learn what to change by completing a short survey.

Search results

Filter by

Remove filters

4,495 results found

Modelled Abstraction Reductions - National Framework for Water Resources 2025

Spreadsheet showing modelled range of potential reductions to abstraction licence quantities that may be needed to meet environmental flow requirements for each water body in England. These...

British Geological Survey (BGS) Multibeam Survey 2010/6: Loch Eriboll (09/Aug/2010 to 20/Aug/2010)

This British Geological Survey (BGS) marine multibeam survey took place in August 2010 in Loch Eriboll on board the RV White Ribbon. The aim was improve the geological understanding of the area and...

Historical (1950-2014) and projected (2015-2100) hydrological model (HMF-WA) estimates of monthly mean and annual maximum river flows across West Africa driven by CMIP6 projected climate data

This dataset comprises seven ensembles of hydrological model estimates of monthly mean and annual maximum river flows (m3s-1) on a 0.1 × 0.1 deg grid (approximate grid of 10 km × 10 km) across West...

Historical (1950-2005) and projected (2006-2099) hydrological model (HMF-WA) estimates of monthly mean and annual maximum river flows across West Africa driven by CMIP5 projected climate data

This dataset comprises seven ensembles of hydrological model estimates of monthly mean and annual maximum river flows (m3s-1) on a 0.1° × 0.1° grid (approximate grid of 10 km × 10 km) across West...

Bristol City Council Land and Building Assets

This dataset comprises all land and building assets owned, used and/or managed by Bristol City Council, with the exception of individual social housing units, in accordance with the requirements of...

Results - Education and Skills Survey 2014

Responses to public and school consultation surveys on the future delivery of education and skills services The two data sets provide anonymised responses to two surveys that were conducted during...

Site Allocations

Areas of land safeguarded for future development.

Heritage at Risk Polygons 2021-2023 GIS data

Heritage at Risk provides an understanding of the overall state of England’s heritage assets. Every year Historic England updates the Heritage at Risk Register. The end result is a dynamic picture...

JSNA Executive Summary 2019

A Joint Strategic Needs Assessment (JSNA) is a way local authorities, the NHS and other public sector partners work together to understand the current and future health and wellbeing needs of the...

Disease cost sharing

Assessing the costs of future exotic animal disease outbreaks

Rail Line Upgrading (Indicative)

Areas of land safeguarded for future raill line upgrading.

Railway Station Safeguarding

Areas of land protected for possible future railway stations.

Historical (1971-2005) and projected (2006-2099) hydrological model (HMF-Malaysia) estimates of monthly mean and annual maximum river flows across Peninsular Malaysia driven by CORDEX-SEA projected climate data

This dataset comprises multiple baseline and future ensembles of hydrological model estimates of monthly mean and annual maximum river flows (m3s-1) on a 0. 0.008333° × 0. 0.008333° grid...

Proposed Cycle Routes Safeguarding (Indicative)

Land protected for existing and future cycle routes and infrastructure.

Employment Sites

Employment Opportunity Sites that are being investigated for their future development potential.

Live conferences

Wilton Park - Conferences being worked on for delivery at a future date

Woodland Carbon Code Projects

The Woodland Carbon Code (www.woodlandcarboncode.org.uk) is the standard for UK woodland creation projects where carbon is accounted for. It is managed by the Forestry Commission. All projects...

NET Safeguarding (Indicative)

Area of land that is protected for future possible extension of the NET.

Record level data on cashback scheme, including payments committed, measures applied for etc.

To monitor the take-up, effectiveness and to model future rounds of the incentives scheme.

Flood risk assessment of the Luanhe river basin under different development strategies and climate scenarios

The dataset describes the data needed for and results produced by the flood risk assessment framework under different development strategies of Luanhe river basin under a changing climate. The...