Filter by
Remove filters
4,912
results found
- Published by:
- Commission for Architecture and the Built Environment
- Last updated:
- 28 February 2014
An assessment of the design quality of housing schemes funded under the Homes and Communities Agency’s Kickstart funding scheme. Housing schemes proceeding to due diligence have been assessed, in...
- Published by:
- London Borough of Hackney
- Last updated:
- 21 March 2017
Shows all statutory listed buildings and monuments in Hackney. From Design Team.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 14 January 2026
This poster on the UKCCSRC Call 2 project, Process-performance indexed design of task-specific ionic liquids for post-combustion CO2 capture, was presented at the Cardiff Biannual, 10.09.14. Grant...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 14 January 2026
This poster on the UKCCSRC Call 2 project, Process-performance indexed design of task-specific ionic liquids for post-combustion CO2 capture, was presented at the Cardiff Biannual, 10.09.14. Grant...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 14 January 2026
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...
- Published by:
- Office for National Statistics
- Last updated:
- 22 April 2016
Presents combined results of the 2011 and 2012 VOICES survey by NHS Area Team
Source agency: Office for National Statistics
Designation: Official Statistics not designated as National...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 14 January 2026
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 14 January 2026
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 14 January 2026
The inherent nature of electricity necessitates a permanent balance between generation and demand in electricity systems. This has obvious implications for the operation of CCS power plants in...
- Published by:
- Veterinary Medicines Directorate
- Last updated:
- 12 December 2013
Typed reports and handwritten 'Confirmartion Of Inspection Reports' issued to a business after an inspection has taken place.
- Published by:
- Veterinary Medicines Directorate
- Last updated:
- 12 December 2013
Details of investigations, including the source of information, the investigation procedure and the outcome, held on the Inspections Management System (IMS) database.
- Published by:
- Veterinary Medicines Directorate
- Last updated:
- 12 December 2013
Inspectors' inspection notes held on the Inspections Management System (IMS) database.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 14 January 2026
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...
- Published by:
- St Helens Council
- Last updated:
- 29 April 2024
Line data displaying the location of designated St Helens Air Quality Management Areas (AQMA). St Helens Council are obliged to designate AQMA's to help improve air quality and the local...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 14 January 2026
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 14 January 2026
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 14 January 2026
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
This infaunal survey was carried out in the summer of 1991.
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 17 May 2018
This infaunal survey was carried out in the summer of 1991.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 14 January 2026
Structural geology data obtained by Land Survey staff during their mapping work. Originally designed for the Mid-Wales Mapping Programme but subsequently used by other teams. Holds details of...