Search results

Filter by

Remove filters

723 results found

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1ES, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1ES, 30.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 Project: FleCCSnet - Flexible CCS Network Development

This project will produce and disseminate the first design and operating guidelines for the flexible operation of CCS pipeline networks. The research will explore how CCS pipeline networks can...

SNH Phase 1 habitat surveys (ARCHIVE)

Phase 1 surveys (polygons only) have been made available to download from Natural Spaces on 05/07/2017. Caveat for data usage: this is an archived dataset and is no longer updated or maintained....

Flexible Resourcing Records

Recruitment - matching skills profiles and availability to identify candidates with the right skills.

Flexible Deployment Tool

Timesheet allocation of hours on variety of projects. Competency Self-Assessments. Only name, position and time allocations & self-assessments held within.

UKCCSRC Call 2 project poster: Towards more flexible power generation with CCS, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 2 project, Towards more flexible power generation with CCS, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C2-214.

Terrestrial Phase 1 Habitat Survey

This dataset holds comprehensive habitat cover data for the whole of Wales derived from a programme of field recording that was begun by the Wales Field Unit (WFU) of the Nature Conservancy Council...

Terrestrial Phase 1 Habitat Survey

This dataset holds comprehensive habitat cover data for the whole of Wales derived from a programme of field recording that was begun by the Wales Field Unit (WFU) of the Nature Conservancy...

UKCCSRC Call 2 project poster: Flexible CCS operations combined with online solvent monitoring: A pilot-scale study, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Flexible CCS operations combined with online solvent monitoring: A pilot-scale study was presented at the CSLF Call project poster reception, London,...

HS2 Phase Two proposed line of route consultation

GIS shapefile data presenting the July 2013 consultation alignments, stations and depots for the proposed HS2 Phase Two proposed line of route between the West Midlands and the East Midlands,...

NYMNPA PHASE 1 Habitat Survey 1989 - Linears

he Phase 1 Habitat Classification and associated field survey technique provide a standardised system to record semi-natural vegetation and other wildlife habitats. The approach is designed to...

NYMNPA PHASE 1 Habitat Survey 1989 - Areas

The Phase 1 Habitat Classification and associated field survey technique provide a standardised system to record semi-natural vegetation and other wildlife habitats. The approach is designed to...

UKCCSRC Call 1 project paper: Operational flexibility options in power plants 1 with integrated post-combustion capture

Flexibility in power plants with amine based carbon dioxide (CO2) capture is identified in the literature as a way of improving power plant revenues. Despite the prior art, the value of flexibility...

LiDAR for Scotland Phase 2 - LAS

The Scottish Public Sector LiDAR (Phase II) dataset was commissioned in response to the Flood Risk Management Act (2009) by the Scottish Government, Scottish Environmental Protection Agency (SEPA),...

LiDAR for Scotland Phase 2 - DTM

The Scottish Public Sector LiDAR (Phase II) dataset was commissioned in response to the Flood Risk Management Act (2009) by the Scottish Government, Scottish Environmental Protection Agency (SEPA),...

LiDAR for Scotland Phase 2 - DSM

The Scottish Public Sector LiDAR (Phase II) dataset was commissioned in response to the Flood Risk Management Act (2009) by the Scottish Government, Scottish Environmental Protection Agency (SEPA),...

Household Support Grant Phase 1 Data

The Household Support Grant (HSG) is a fund provided by the Department for Work and Pensions and administered by local authorities. The purpose of the fund is to provide targeted support to...