Filter by
Remove filters
4,317
results found
- Published by:
- Department for Transport
- Last updated:
- 30 August 2013
Timesheet allocation of hours on variety of projects. Competency Self-Assessments. Only name, position and time allocations & self-assessments held within.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 21 January 2026
This poster on the UKCCSRC Call 2 project, Towards more flexible power generation with CCS, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C2-214.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 21 January 2026
This project aims to build on and strengthen joint industry research programmes between Edinburgh, Doosan Power Systems in the UK and Sulzer ChemTech, a world leading manufacturer of separation...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 21 January 2026
This poster on the UKCCSRC Call 2 project Flexible CCS operations combined with online solvent monitoring: A pilot-scale study was presented at the CSLF Call project poster reception, London,...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 21 January 2026
Flexibility in power plants with amine based carbon dioxide (CO2) capture is identified in the literature as a way of improving power plant revenues. Despite the prior art, the value of flexibility...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 21 January 2026
This data contains the output from the first Flexible CCS Network Development (FleCCSnet) workshop of stakeholders discussing the development of CO2 networks in the UK. The first was held on the 30...
- Published by:
- Greater London Authority
- Last updated:
- 27 January 2026
Boundaries of High Streets as developed by the Regeneration team at the Greater London Authority. NOTE: these boundaries will be used when sharing data about High Street spend and footfall. They...
- Published by:
- Department for Business, Energy and Industrial Strategy
- Last updated:
- 12 August 2013
This data describes SME use of high performance work practices. It supports a report on the rationale and evidence base for policy development in high performance working. The report also...
- Published by:
- Ordnance Survey
- Last updated:
- 25 September 2025
The alignment of the limit of tidal water at Mean High Water (or Mean High Water Springs in Scotland), formed by merging individual Tidal Boundary features.
- Published by:
- Ordnance Survey
- Last updated:
- 10 January 2025
In the OS NGD Boundaries Collection, the mean high water (springs) mark is shown to the normal tidal limit (NTL). Areas of salt marsh, mudflats and so on often have extremely complicated tide...
- Published by:
- Department for Transport
- Last updated:
- 12 December 2013
Information held on Your Reward system covers staff names, staff number, location, age, grade, start date, work status, salary, contract hours, tax code and NI, benefits selected and costs. Payroll...
- Published by:
- Northern Ireland Statistics and Research Agency
- Last updated:
- 10 May 2014
This publication contains information on the High Court in Northern Ireland in relation to: chancery, Queen's Bench, judicial reviews, probate, wardship and adoption, matrimonial, bails, patients,...
- Published by:
- Greater London Authority
- Last updated:
- 28 October 2025
Boundaries of High Streets as developed by the Regeneration team at the Greater London Authority. NOTE: these boundaries will be used when sharing data about High Street spend and footfall. They...
- Published by:
- High Peak Borough Council
- Last updated:
- 11 December 2025
High Peak Borough Council's Brownfield Register published in accordance with regulation 18(2) of the Town & Country Planning (Brownfield Land Register) Regulations 2017.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 21 January 2026
This poster on the UKCCSRC Call 1 project Flexible CCS Network Development (FleCCSnet) was presented at the CSLF Call project poster reception, London, 27.06.16. Grant number: UKCCSRC-C1-40. The...
- Published by:
- Royal Borough of Kensington and Chelsea
- Last updated:
- 13 December 2023
This is a buffer around the proposed High Speed 2 railway. Properties applying for planning permission must be flagged. Property owners within the zone who would feel adversely affected can serve...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 21 January 2026
This poster on the UKCCSRC Call 2 project Towards more flexible power generation with CCS was presented at the UKCCSRC Manchester Biannual Meeting, 13.04.2016. Grant number: UKCCSRC-C2-214.
- Published by:
- Greater London Authority
- Last updated:
- 27 January 2026
The report below includes insights derived from Mastercard retail spend data by the High Streets Data Service.
The data has been aggregated London-wide and by town centre type to provide insights...
- Published by:
- Scottish Government SpatialData.gov.scot
- Last updated:
- 19 June 2024
The Development High Risk Area is the part of the coal mining reporting area which contains one or more recorded coal mining related features which have the potential for instability or a degree of...
- Published by:
- Ashford Borough Council
- Last updated:
- 10 February 2016
This extract is taken from ArcGIS created polygons showing areas of high weald ancient woodland within the borough of Ashford, Kent.