Search results

Filter by

Remove filters

2,803 results found

NSTA Offshore Field Determinations (WGS84)

Offshore field determinations 

NSTA Offshore Field Determinations (ETRS89)

Offshore field determinations 

Scarborough Borough Council New Local Plan Committed Employment Sites

Extents of Committed Employment Site areas in the Borough of Scarborough as polygons. Created as part of the New Local Plan 2015. Subject to Ordnance Survey Licensing. See...

Scarborough Borough Council New Local Plan Committed Housing Sites

Extents of Committed Housing Site areas in the Borough of Scarborough as polygons. Created as part of the New Local Plan 2015. Subject to Ordnance Survey Licensing. See...

Government Secure Intranet (GSI) Personal Commitment Statements (PCS)ᅠ

Government Secure Intranet (GSI) Personal Commitment Statements (PCS)ᅠ is an application for internal Department for Environment, Food and Rural Affairs (Defra) use only. It is used by all new IT...

Greening Government Commitment Data

Quarterly reports to the Department for Transport, measuring against baselines, our reduction of our waste amounts, improving recycling and energy efficiency. Travel is a key component and also...

Contaminated Land Determined Site - Rochdale Borough Council

Sites which have been determined as contaminated land in accordance with Part 2A of the 1990 Environmental Protection Act (EPA) within the District of Rochdale MBC.

Monitoring Determinants

Connective Reference Data (Code-List) that lists the things that Defra and its Arms Length Bodies Monitor. This does not currently exist in a consolidated form but exists in part in each...

Private rent determinations for Housing Benefit (HB)

The purpose of the dataset is to provide an indication of the geographical distribution of private tenants' applications for Housing Benefit, to show the size, type and age of dwellings concerned,...

Tonnage Tax Training Commitment database

List of trainee cadets with number of months they have been training against the Company name to ensure that Companies are fulfilling their training requirements.

% of major applications determined within 13 Weeks (NPI157a)

% of major applications determined within 13 Weeks (NPI157a)

% of other applications determined within 8 Weeks (NPI157c)

% of other applications determined within 8 Weeks (NPI157c) *This indicator has been discontinued

% of non-major applications determined within 8 Weeks (NPI157b)

% of non-major applications determined within 8 Weeks (NPI157b)

Cambridgeshire Renewable Energy Completions and Commitments 2017

Number of installed capacity of renewable energy (Megawatts) in each financial year from 1999/00 to 2016/17. Worksheet includes data by district and type of renewable energy. This data...

Information for each Carbon Reduction Commitment (CRC) participant

The CRC Order 2013 provides for publication of information on the basis of participants' annual reports plus details submitted when they registered for the scheme. The CRC Energy Efficiency Scheme...

Determination of Hydraulic Properties of distributed Fractures Using Seismic Techniques

We propose to develop innovative seismic techniques for establishing links between hydraulic or fluid flow properties (porosity, permeability, connectivity) and seismic properties (impedance,...

An estimate of youth crime in England and Wales: Police recorded crime committed by young people in 2009/10

An estimate of the proportion and number of police recorded crimes committed by young people aged 10 to 17 in 2009/10. The approach used was to apply data on proven offending from the Police...

EPSRC project final report: Fingerprinting captured CO2 using natural tracers: Determining CO2 fate and proving ownership

Final report for EPSRC project, Fingerprinting captured CO2 using natural tracers: Determining CO2 fate and proving ownership. Grant number: #EP/K036033/1.

UKCCSRC Call 1 project presentation: Determination of water Solubility in CO2 Mixtures, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Determination of water Solubility in CO2 Mixtures, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-21.

UKCCSRC Call 1 project poster: Determination of water Solubility in CO2 Mixtures, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Determination of water Solubility in CO2 Mixtures, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-21.