Search results

Filter by

Remove filters

3,353 results found

NI 067 - Percentage of child protection cases which were reviewed within required timescales

Child protection cases which were reviewed within agreed required timescales Source: Childrens Social Care Geographies: County/Unitary Authority, Government Office Region (GOR), National Geographic...

2001 English Nature (EN) South Walney Lagoons: Conservation Management Requirements Study

Survey name: 2001 English Nature (EN) South Walney Lagoons: Conservation Management Requirements Study This is a collation of surveys to gather data and evidence from a variety of marine...

Performance Dashboard Applications for Safety Zone consents, required for offshore renewable energy installations

This dashboard shows information about how the Applications for Safety Zone consents, required for offshore renewable energy installations service is currently performing. This is a "beta"...

Trade Union (Facility Time Publication Requirements) Regulations 2017 - Central and Education (Maintained School) Functions

Set out below is the information the council is required to publish under the Trade Union (Facility Time Publication Requirements) Regulations 2017 for its central and education (maintained...

Emergency admissions for acute conditions that should not usually require hospital admission (CCGOIS 3.1)

Directly age and sex standardised admission rate for emergency admissions for acute conditions that should not usually require hospital admission per 100,000 registered patients, 95% confidence...

Rail Technical tender documents

Tender documents, in particular, those for research projects

Rail Technical Contract Information

Contract information (e.g. employment of consultants/contractors, temps and other non-permanent staff) in support of DfT's rail research programme.

Bishopsgate Goodsyard Technical Reports

GLA Projections Technical Note LATEST

Description and analysis of GLAs latest set of demographic projections for Camden.

Performance Dashboard Applications for Section 36 consents, required for the construction, extension or operation of electricity generating stations

This dashboard shows information about how the Applications for Section 36 consents, required for the construction, extension or operation of electricity generating stations service is currently...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 05: Technical Design-Carbon capture and compression plant

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

MOT (Ministry of Transport) Technical Information

Internal database used for MOT Inspection Manual amendments. To go on the Intranet in due course. MOT Inspection Manual is used for periodic queries taken by Enquiry Unit that appear to not be in...

Shell and ExxonMobil Technical Reports

A number of formerly proprietary reports, courtesy of Shell and ExxonMobil, covering regional and subsurface aspects of the Central North Sea, including individual operators’ experiences in low...

Map based index (GeoIndex) technical reports

This layer of the map based index (GeoIndex) provides an index to a sub set of the BGS Report Series. The reports themselves describe the local geology and are designed to be read in conjunction...

NI 066 - Looked after children cases which were reviewed within required timescales.

The indicator measures the percentage of children looked after cases which should have been reviewed during the year ending 31 March that were reviewed on time during the year Source: Statutory...

NI 089 - Reduction of number of schools judged as requiring special measures

The number of failing schools. A failing school is one judged on inspection by Ofsted to be providing inadequate education and lacking the capacity to improve, and therefore placed in special...

NI 066 - Looked after children cases which were reviewed within required timescales.

The indicator measures the percentage of children looked after cases which should have been reviewed during the year ending 31 March that were reviewed on time during the year

2005 Strategic Environmental Assessment SEA6 Technical Report - Underwater Ambient Noise (Irish Sea)

This report is a contribution to the Strategic Environmental Assessment (SEA6) conducted by the Department of Trade and Industry (now Department of Energy and Climate Change). This report reviews...

Efficiency in the higher education sector: technical exploration

The efficiency scores, as shown in the historgrams, that are derived from the econometric analysis.

Management Strategy Evaluation toolkit for Ecopath with Ecosim (model output and technical report)

This dataset consists of output from a computer model that predicts responses of 69 functional groups from plankton to whales to changing fishing pressure. Scenarios are run using the newly built...