Search results

Filter by

Remove filters

4,072 results found

LiDAR for Scotland Phase 4 - DSM

The Scottish Public Sector LiDAR (Phase 4) was initially captured by Fugro for Scottish Power Energy Network (SPEN) from 2017 to 2019 to monitor their overhead power cable network under their...

HSG Phase 2 Ward Data - Oct 22

The Household Support Grant (HSG) is a fund provided by the Department for Work and Pensions and administered by local authorities. The purpose of the fund is to provide targeted support to...

LiDAR for Scotland Phase 4 - LAS

The Scottish Public Sector LiDAR (Phase 4) was initially captured by Fugro for Scottish Power Energy Network (SPEN) from 2017 to 2019 to monitor their overhead power cable network under their...

LiDAR for Scotland Phase 4 - DTM

The Scottish Public Sector LiDAR (Phase 4) was initially captured by Fugro for Scottish Power Energy Network (SPEN) from 2017 to 2019 to monitor their overhead power cable network under their...

LiDAR for Scotland Phase 1 - LAS

The Scottish Public Sector LiDAR (Phase I) dataset was commissioned in response to the Flood Risk Management Act (2009) by the Scottish Government, Scottish Environmental Protection Agency (SEPA),...

LiDAR for Scotland Phase 1 - DSM

The Scottish Public Sector LiDAR (Phase I) dataset was commissioned in response to the Flood Risk Management Act (2009) by the Scottish Government, Scottish Environmental Protection Agency (SEPA),...

LiDAR for Scotland Phase 1 - DTM

The Scottish Public Sector LiDAR (Phase I) dataset was commissioned in response to the Flood Risk Management Act (2009) by the Scottish Government, Scottish Environmental Protection Agency (SEPA),...

Household Support Grant (HSG) Data Phase 2 Oct 22

The Household Support Grant (HSG) is a fund provided by the Department for Work and Pensions and administered by local authorities. The purpose of the fund is to provide targeted support to...

Phase 2a West Midlands to Crewe

Phase 2a West Midlands to Crewe GIS data The data provided here relates to information and/or engineering design described within the High Speed Rail (West Midlands to Crewe) Environmental...

Rayleigh wave phase delays and Vsv upper-mantle structure in the Pacific

This repository contains data and inversion results for the SOLA finite-frequency tomography of the Pacific upper-mantle. It is linked to the paper by Latallerie et al., in prep, which follows one...

LiDAR for Scotland Phase 3 - DTM

The Scottish Public Sector LiDAR (Phase 3) was initially captured by Fugro for Scottish Power Energy Network (SPEN) in 2015 and 2016 and to monitor their overhead power cable network under their...

LiDAR for Scotland Phase 3 - LAS

The Scottish Public Sector LiDAR (Phase 3) was initially captured by Fugro for Scottish Power Energy Network (SPEN) in 2015 and 2016 and to monitor their overhead power cable network under their...

Phase 2 Sand Dune Survey of Wales

This is a spatial dataset containing a collation of all mapped sand dune habitats in Wales. Over 40 NVC Phase 2 surveys were carried out on sand dunes across Wales. This dataset is a collation of...

LiDAR for Scotland Phase 3 - DSM

The Scottish Public Sector LiDAR (Phase 3) was initially captured by Fugro for Scottish Power Energy Network (SPEN) in 2015 and 2016 and to monitor their overhead power cable network under their...

Phase 2 Sand Dune Survey of Wales

This is a spatial dataset containing a collation of all mapped sand dune habitats in Wales. Over 40 NVC Phase 2 surveys were carried out on sand dunes across Wales. This dataset is a collation of...

HS2 Phase Two: from the West Midlands to Leeds and Manchester

HS2 Phase 2b: from the West Midlands to Leeds and Crewe to Manchester The data provided here relates to information and/or engineering design published during the Development Phase of High Speed...

UKGEOS Glasgow Construction Phase Groundwater Chemistry Data Release

The data release includes groundwater chemistry data from 8 samples and 2 tap water samples collected during the borehole construction phase at the UK Geoenergy Observatories (UKGEOS) Glasgow...

pedestrian_priority_measures

pedestrian_priority_measures Polygon dataset indicating geographic location of designated areas for Pedestrian Priority Measures within Clacton Town centre. Upon accessing this Licensed Data you...

Living England Habitat Map (Phase 4)

The Living England project, led by Natural England, is a multi-year programme delivering a satellite-derived national habitat layer in support of the Environmental Land Management (ELM)...

Social Integration Headline Measures

The Mayor is committed to measuring social integration in London. Providing evidence-based analysis of the state of social integration will allow him to shine a light on the whole...