Important

We're planning improvements to this service. Help us learn what to change by completing a short survey.

Search results

Filter by

Remove filters

2,552 results found

Bowland Shale dataset: field and sample photographs, sample descriptions, microphotographs, x-ray fluorescence, LECO elemental analysis, x-ray diffraction and RockEval pyrolysis from Hind Clough, MHD4 and Cominco S9 (NERC grant NE/L002493/1)

The data were produced by Joe Emmings, NERC-funded PhD student at the University of Leicester and British Geological Survey, between 2014 and 2017. Authors of these data: Joe Emmings a, b; Sarah...

Risk of Flooding from Rivers and Sea

PLEASE NOTE: This record has been retired. It has been superseded by: https://environment.data.gov.uk/dataset/96ab4342-82c1-4095-87f1-0082e8d84ef1 This record is for Approval for Access product...

MAMM: Airborne Methane and Other Greenhouse Gases Measurements

The Methane and other greenhouse gases in the Artic - Measurements, process studies and Modelling (MAMM) project was a consortium as part of the NERC Artic Research Programme. This project used a...

Measurements, process studies and Modelling (MAMM) program: Airborne Methane and Other Greenhouse Gases Measurements

The Methane and other greenhouse gases in the Artic - Measurements, process studies and Modelling (MAMM) project was a consortium as part of the NERC Artic Research Programme. This consortium...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 02: FEED Cost Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Green Job Postings

About this dataset This page presents experimental analysis related to green jobs and skills in London, using online job postings data provided by Lightcast. This near real-time data can be...

3D Urban Interactive geological models

3D geology models have been created for London, Glasgow, Cardiff, Liverpool and Gateshead. Users can create geological cross-sections, synthetic boreholes and horizontal slices through the 3D...

Scottish Carbon Capture & Storage (SCCS)

SCCS is the largest Carbon Capture and Storage (CCS) research group in the UK. Our internationally renowned researchers provide connected strength across the full CCS chain. With our unique...

Employment Land Supply - South Ayrshire

The employment land supply is intended to meet the requirements of Scottish Planning Policy, which states (at paragraph 46) that: - “Planning authorities should ensure there is a range and choice...

Planning Inspectorate - Planning Appeals Casework

The data in this data set covers the last 5 rolling years for appeals with a decision date. Appeals currently in progress and those which have been withdrawn or turned away are not...

Conserving farmland biodiversity and ecosystem services (Contribution to European project ‘Farmland’)

Report contains data that can be used under Open Government Licence. Main report (pdf) contains data as does 4 of the appendices - pdf with data in tables. The aim of this project is to examine...

Innovation in mapping ecosystem services and understanding the ecosystems approach to the protected site

Report contains data that can be used under Open Government Licence. Main report mostly narrative. 3 technical reports contain data. This project is collaboration with Biodiversity and Ecosystem...

Risk of Flooding from Rivers and Sea - Properties in Areas at Risk

PLEASE NOTE: This record has been retired. It has been superseded by: https://environment.data.gov.uk/dataset/4c8981b3-11c1-40ca-b7a2-7c3f45a97397 This dataset is a product of a national...

GlaciStore: pre-proposal to IODP, UK CCS RC, Call 1 (31 March 2014)

Pre-proposal for scientific drilling 'GlaciStore: Understanding Late Cenozoic glaciation and basin processes for the development of secure large-scale offshore CO2storage (North Sea)', submitted to...

North Norfolk District Council Article 4 Direction

This dataset relates to areas of land where planning permission is required, which would normally not be required, to assist in the protection of other heritage assets

Non HEI provider tracker

To track the progress of non HEI providers required to reconfigure their governance structures in order to comply with Department for Education NCTL governance requirements. Not subject to licence.

Databases of Regional Growth Fund bids, appraisals and monitoring information

Information required to manage the allocation of grant funds and subsequently monitor that the recipients are disbursing according to contractual requirements - Note: monitoring information is...

London Borough Of Camden Pay Gap Report - 2016-17

The Council's annual analysis of pay by gender, ethnic origin and disability. Following the introduction of legislation requiring organisations to report gender pay information from April 2017, the...

ESSnet finance

This (financial and personal) data is required to be kept as part of the auditing process of the co-ordinating country. It is required to be retained for several years after the ESSnet is completed.

South Ayrshire Health & Social Care Partnership Locality Boundaries

Locality planning is a key element of Health & Social Care Integration and with the enactment of the Public Bodies (Joint Working) (Scotland) Act, 2014 has become a legal requirement in...