Search results

Filter by

Remove filters

310 results found

UKCCSRC Call 2 project poster: Towards more flexible power generation with CCS, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 2 project, Towards more flexible power generation with CCS, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C2-214.

Flexible Resourcing Records

Recruitment - matching skills profiles and availability to identify candidates with the right skills.

Flexible Deployment Tool

Timesheet allocation of hours on variety of projects. Competency Self-Assessments. Only name, position and time allocations & self-assessments held within.

UKCCSRC Call 2 project poster: Flexible CCS operations combined with online solvent monitoring: A pilot-scale study, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Flexible CCS operations combined with online solvent monitoring: A pilot-scale study was presented at the CSLF Call project poster reception, London,...

UKCCSRC Call 1 project paper: Operational flexibility options in power plants 1 with integrated post-combustion capture

Flexibility in power plants with amine based carbon dioxide (CO2) capture is identified in the literature as a way of improving power plant revenues. Despite the prior art, the value of flexibility...

UKCCSRC Call 1 project reports: Developing CO2 networks: Information from the First Flexible CCS Network Development (FleCCSnet) project workshop

This data contains the output from the first Flexible CCS Network Development (FleCCSnet) workshop of stakeholders discussing the development of CO2 networks in the UK. The first was held on the 30...

MMO1044 spatial confidence in the essential fish habitat modelled outputs

This data shows the relative confidence on the EFH model prediction calculated by combining information on the statistical model predictive ability, confidence assigned to the input data layers...

Your Reward Flexible Benefits System

Information held on Your Reward system covers staff names, staff number, location, age, grade, start date, work status, salary, contract hours, tax code and NI, benefits selected and costs. Payroll...

UKCCSRC Call 1 project poster: Flexible CCS Network Development (FleCCSnet), CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Flexible CCS Network Development (FleCCSnet) was presented at the CSLF Call project poster reception, London, 27.06.16. Grant number: UKCCSRC-C1-40. The...

UKCCSRC Call 2 Project: Towards more flexible power generation with CCS: pilot plant test campaigns for best practice guidelines for post-combustion capture

This project aims to build on and strengthen joint industry research programmes between Edinburgh, Doosan Power Systems in the UK and Sulzer ChemTech, a world leading manufacturer of separation...

UKCCSRC Call 2 project poster: Dynamic and flexible operation of post-combustion capture: A pilot-scale test campaign with online solvent monitoring, UKCCSRC Manchester Biannual Meeting, 13.04.2016

This poster on the UKCCSRC Call 2 project Towards more flexible power generation with CCS was presented at the UKCCSRC Manchester Biannual Meeting, 13.04.2016. Grant number: UKCCSRC-C2-214.

UKCCSRC Call 1 project paper: Enhanced operating flexibility and optimised off-design operation of coal plants with post-combustion capture

The inherent nature of electricity necessitates a permanent balance between generation and demand in electricity systems. This has obvious implications for the operation of CCS power plants in...

GM Accessibility Levels (GMAL)

Greater Manchester Accessibility Levels (GMAL) are a detailed and accurate measure of the accessibility of a point to both the conventional public transport network (i.e. bus, Metrolink and rail)...

Land Capability for Forestry, Scotland

The main use of the Land Capability Classification for Forestry is as an aid to decision-making at broad planning levels, as a guide for land managers and as a statement of the natural resources of...

Consultation on modern workplaces: impact assessments

Underlying data from the impact assessments underlying the consultation on modern workplaces [URN 11/699] Underlying data from the impact assessments: Underlying data from the publication Working...

UKCCSRC Call 2 Project C2-214 - Sulzer Chemtech dynamic test campaign data, Jan 2015

This dataset relates to the scientific journal article "A pilot-scale study of dynamic response scenarios for the flexible operation of post-combustion CO2 capture" (Tait et al. 2016), a study...

CO2 leakage detection

UKCCSRC Flexible Funding 2020. Experimental data are the acoustic emission (AE) signals collected with three AE sensors when CO2 leak from a CO2 storage cylinder under different pressures....

CO2 Flow Metering

UKCCSRC Flexible Funding 2020. The experimental data was collected on a 1-inch bore gas-liquid two-phase CO2 flow rig in real time. The first column of the table is the time stamp. The second to...

Towards more flexible power generation with CCS (C2-214) – Dynamic and steady-state data from UKCCSRC PACT amine pilot, Aug 2016.

UKCCSRC Call 2 Project C2-214 . The dataset consists of six excel spreadsheets containing data from six dynamic operating scenarios for post-combustion CO2 capture on coal, implemented at the...

Properties Vulnerable to Heat Impacts in London

The Properties Vulnerable to Heat Impact report, produced by Arup, maps London's heat risk across homes, neighbourhoods, and essential properties in the wake of climate change. The study focused on...