Important

We're planning improvements to this service. Help us learn what to change by completing a short survey.

Search results

Filter by

Remove filters

3,131 results found

Critical care bed capacity and cancelled operations: monthly situation reports

Monthly data on critical care bed use and cancelled urgent operations Source agency: NHS England Designation: Official Statistics not designated as National Statistics Language:...

Critical care bed capacity and cancelled operations: monthly situation reports

Monthly data on critical care bed use and cancelled urgent operations Source agency: Health Designation: Official Statistics not designated as National Statistics Language: English Alternative...

NIW ANALYSIS OF TURNOVER AND OPERATING INCOME 2019 2020

NI Water Annual Information Return 2019 2020 Table 23 Regulatory Accounts Analysis of Turnover and Operating Income

NI 185 - CO2 reduction from Local Authority operations

Percentage CO2 reduction from LA operations: an annually measured reduction of emissions against a set baseline

Performance Dashboard Generic operator returns: water abstraction

This dashboard shows information about how the Generic operator returns: water abstraction service is currently performing. This is a "beta" service. The dashboard shows number of digital...

DOE Driver, Vehicle, Operator and Enforcement Statistics

This is a quarterly update of information on the testing, licensing and enforcement / compliance activities of the Driver and Vehicle Agency. Prior to quarter 1, April to June 2013, this publicaton...

DH Richmond House Real Time Energy Usage

This datset shows the realtime energy and CO2 usage (minus 1 day) for Richmond House, the HQ building for Department of Health.

Tunbridge Wells Open Data - Transparency - Asset Register Non Operational 2019

Tunbridge Wells Open Data - Transparency - Asset Register Non Operational 2019

Planning and Operations

Includes casework, monitoring technical information

NI Water AIR21 PPP Reporting Operational Costs 2020 2021

NI Water Annual Information Return 2020 2021 Table 43 PPP Reporting Operational Costs

NI 185 CO2 reduction from Local Authority operations

Percentage CO2 reduction from LA operations: an annually measured reduction of emissions against a set baseline Source: Department for Environment Food and Rural Affairs (DEFRA) Publisher: DCLG...

Tunbridge Wells Open Data - Local Authority Land - Asset Register Non Operational

Tunbridge Wells Open Data - Transparency - Asset Register Operational 2021 to 2022

Private hire drivers and vehicles registered to each licensed operator

Automated Update ---------------- Private hire operators licensed in leeds and the number of private hire vehicles and drivers that are registered as working with them. This dataset is updated...

Cereals Stocks held by Ports, Co-operatives and Merchants

Provides levels of stocks of wheat, barley, oats and maize in port, co-operative and merchant stores in the UK. Source agency: Environment, Food and Rural Affairs Designation: National...

UKCCSRC Call 1 Project: Experimental investigation and CFD modelling of oxy-coal combustion on PACT facility with real flue gas and vent gas recycling

The project will investigate the impacts of real flue gas and vent gas recycling on the combustion performance, emissions, ignition and flame stability of oxy-coal combustion by means of 250kW PACT...

Antarctic Mesoscale Prediction System (AMPS): real-time numerical weather prediction model output at 4.5 and 6km resolution for the Antarctic

The Antarctic Mesoscale Prediction System (AMPS) is an experimental, real-time numerical weather prediction capability that provides support for the United States Antarctic Program, Antarctic...

Antarctic Mesoscale Prediction System (AMPS): real-time numerical weather prediction model output at 4.5 and 6km resolution for the Antarctic

The Antarctic Mesoscale Prediction System (AMPS) is an experimental, real-time numerical weather prediction capability that provides support for the United States Antarctic Program, Antarctic...

% of ultra-low emission Licensed Taxis operating in York (Electric and Hybrid)

% of ultra-low emission Licensed Taxis operating in York (Electric and Hybrid)

Operational project delivery plans

Project plans that are used to help deliver the work of the Procurement Policy & Capability Team

Ringtail operated by Nabarro

Document management system for knee litigation disclosure. Access allowed to plaintiffs legal representatives