Important

We're planning improvements to this service. Help us learn what to change by completing a short survey.

Search results

Filter by

Remove filters

3,219 results found

Tunbridge Wells Open Data - Transparency - Asset Register Non Operational 2019

Tunbridge Wells Open Data - Transparency - Asset Register Non Operational 2019

Planning and Operations

Includes casework, monitoring technical information

NI Water AIR21 PPP Reporting Operational Costs 2020 2021

NI Water Annual Information Return 2020 2021 Table 43 PPP Reporting Operational Costs

NI 185 CO2 reduction from Local Authority operations

Percentage CO2 reduction from LA operations: an annually measured reduction of emissions against a set baseline Source: Department for Environment Food and Rural Affairs (DEFRA) Publisher: DCLG...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 10: CCS Project Costs Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Tunbridge Wells Open Data - Local Authority Land - Asset Register Non Operational

Tunbridge Wells Open Data - Transparency - Asset Register Operational 2021 to 2022

Private hire drivers and vehicles registered to each licensed operator

Automated Update ---------------- Private hire operators licensed in leeds and the number of private hire vehicles and drivers that are registered as working with them. This dataset is updated...

Cereals Stocks held by Ports, Co-operatives and Merchants

Provides levels of stocks of wheat, barley, oats and maize in port, co-operative and merchant stores in the UK. Source agency: Environment, Food and Rural Affairs Designation: National...

SEVIRI (Spinning Enhanced Visible and InfraRed Imager) Fire Radiative Power (FRP) data from the Meteosat Second Generation (MSG) Satellite

The Fire Radiative Power (FRP) is a measure of the rate of radiant heat output from a fire. It has been demonstrated in small-scale experimental fires that the FRP of a fire is related to the rate...

SEVIRI (Spinning Enhanced Visible and InfraRed Imager) Fire Radiative Power (FRP) data from the Meteosat Second Generation (MSG) Satellite

The Fire Radiative Power (FRP) is a measure of the rate of radiant heat output from a fire. It has been demonstrated in small-scale experimental fires that the FRP of a fire is related to the rate...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 11: Lessons Learned Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 05: FEED Decisions Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

% of ultra-low emission Licensed Taxis operating in York (Electric and Hybrid)

% of ultra-low emission Licensed Taxis operating in York (Electric and Hybrid)

Operational project delivery plans

Project plans that are used to help deliver the work of the Procurement Policy & Capability Team

Ringtail operated by Nabarro

Document management system for knee litigation disclosure. Access allowed to plaintiffs legal representatives

DFMS - Accounting Operations (IYM)

Accounting Application including; - Shared Service Centre (SSC) General Ledger (GL) - TLB GLs - Fixed Asset Module (Including MEAD2, SBSO FARs, Merlin, Maestro) - Accounts Payable - Accounts...

Welsh Permitted Waste Operations

The EU Waste Framework Directive (2008/98EC) provides the legislative framework for the collection, transport, recovery and disposal of waste. The directive requires all Member States to take the...

Welsh Permitted Waste Operations

The EU Waste Framework Directive (2008/98EC) provides the legislative framework for the collection, transport, recovery and disposal of waste. The directive requires all Member States to take...

Field Operations Staff Hours

A rolling 12 months of time recording by Official Veterinarians and Meat Hygiene Inspectors in approved meat premises on the FSA electronic time recording system and broken down by month.

NI Water Regulatory Accounts Analysis of Turnover and Operating Income 2019 2020

NI Water Annual Information Return - Regulatory Accounts Analysis of Turnover and Operating Income 2019 2020