Utilisation (peak demand as % of firm capacity) at Northern Powergrid Primary Substations DFES 2021 (System Transformation)

Northern Powergrid DFES 2021

You're previewing the first 4 rows of this file.

Download CSV Download
Primary 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050 Licence area Voltage level Scenario name Output parameter
ACKLAM 75.9 75.8 74 72.1 70.8 70.1 70 71 72.3 73.9 75.9 78.2 81.3 84.3 87.8 91.8 95.9 100.1 105.1 109.7 114.1 117.9 121.9 124.8 126.6 128.3 129.8 131.7 132.8 133.8 134.7 135.4 NPgN Primary NG FES - System Transformation (EE CF) Peak utilisation (percent - whole number)
AMBERTON ROAD 58.1 57.9 57.9 57 56.2 55.9 55.8 56.4 57.3 58.4 59.7 61.2 63.4 65.5 67.9 70.6 73.4 76.6 80.2 83.4 86.3 88.9 91.7 93.5 94.8 95.9 96.8 98.1 98.8 99.5 100 100.5 NPgN Primary NG FES - System Transformation (EE CF) Peak utilisation (percent - whole number)
ANNFIELD 66/20KV 74.2 74 72.6 71.1 70 69.4 69.3 70.1 71.2 72.7 74.4 76.4 79.4 82.3 85.8 89.7 93.7 98.1 103.3 108.1 112.5 116.4 120.4 123.2 125.2 127 128.6 130.5 131.7 132.8 133.7 134.5 NPgN Primary NG FES - System Transformation (EE CF) Peak utilisation (percent - whole number)
ASHINGTON 77.4 77.3 75.9 74.4 73.3 72.9 73 74.2 75.7 77.5 79.7 82.3 85.8 89.4 93.6 98.2 103.1 108.2 114.4 120 125.2 129.8 134.5 137.9 140.3 142.3 144.2 146.5 147.9 149.3 150.4 151.4 NPgN Primary NG FES - System Transformation (EE CF) Peak utilisation (percent - whole number)