An oil and gas industry site survey for a platform/pipeline route acquired under licence P335 between May and June 2011. The block number traversed was 9/11. This was a shallow drilling survey without any seismic sources. It drilled 8 shallow boreholes to maximum depth of 102m below the seafloor for a planned jacket location. All borings were within a 209m radius of the planned wellbay centre. No borings were drilled for anchor locations. 11 samples of the seabed surface were taken along a planned pipeline route.