Search directory

Filter by

927 results found

Dickeya Solani

Emerging threat to Scottish potato production posed by Dickeya Solani

Business Continuity plan

Business Continuity plan to be facilitated in the event of an emergency.

Kent and Essex IFCA whelk pot hole size pilot study 2012

In response to a dramatic increase in the number of whelk pots being set in the district in 2011, KEIFCA introduced an emergency byelaw limiting the number of pots per vessel to 300. As part of the...

Kent and Essex IFCA whelk pot hole size pilot study 2012

In response to a dramatic increase in the number of whelk pots being set in the district in 2011, KEIFCA introduced an emergency byelaw limiting the number of pots per vessel to 300. As part of the...

UK National Nuclear Database - RIMNET

Radiological and other Environmental Monitoring & Reference Data For information sharing and emergency response

Voice Recording System

Emergency call recorder - details time of call, identity of caller and position of caller

Unplanned hospitalisation for chronic ambulatory care sensitive conditions (NHSOF 2.3.i)

This indicator measures how many people with specific long-term conditions, which should not normally require hospitalisation, are admitted to hospital in an emergency. These conditions include,...

2015 International Council for the Exploration of the Sea (ICES) European distribution of Ensis directus

A review of the European distribution of Ensis directus from its introduction to the Elbe in 1978 up to 2015. This dataset reports a subset of this dataset, a single record from Southend-on-Sea to...

2015 International Council for the Exploration of the Sea (ICES) European distribution of Ensis directus

A review of the European distribution of Ensis directus from its introduction to the Elbe in 1978 up to 2015. This dataset reports a subset of this dataset, a single record from Southend-on-Sea to...

2005 BP Exploration Operating Company Ltd North Everest Platform site survey May 2005 Environmental Report

The aim of this survey was to provide a post-development benthic investigation of the seabed composition and associated fauna in an area surrounding the North Everest Platform.

2014, BP Exploration, 2014 Marnock Site Survey, Debris Clearance Survey, DECC Reference Number GS_108

An oil and gas industry debris clearance site survey acquired under licences P092, P358 in July 2014. The block number traversed was 22/24.

2014, BP Exploration, 2014 Machar 3D HR, Site Survey, DECC Reference Number GS_84

An oil and gas industry drilling hazard, debris clearance site survey acquired under licence P057 between June and July 2014. The block number traversed was 23/26.

2004, BP Exploration, EROS - Western Location, Site Survey, BGS Reference Number BP04SS0004

An oil and gas industry site survey acquired between December and January 2004. The block numbers traversed were 47/10 and 47/15.

2001, BP Exploration, Juno, Pipeline/Cable Route Survey, BGS Reference Number BP01SS0003

An oil and gas industry site survey for a pipeline/cable route acquired in June 2001. The block numbers traversed were 42/28, 42/29, 47/3 and 47/4.

1999, BP Exploration, Indefatigable D, Debris Clearance Survey, BGS Reference Number BP99SS0005

An oil and gas industry site survey for debris clearance acquired in July 1999. The block number traversed was 49/23.

2002, BP Exploration, Rhum Field Development, Site Survey, BGS Reference Number BP02SS0005

An oil and gas industry site survey acquired between July and August 2002. The block number traversed was 3/29.

2024, BP Exploration, Clair Ridge Expansion Geotechnical Survey, Route Survey, DECC Reference Number GS_1761

An oil and gas industry route geotechnical site survey for Clair Ridge expansion acquired between August and September 2024.

2025, BP Exploration, 2025 Galvani Integrated Site Survey, Site Survey, DECC Reference Number GS_1874

An oil and gas industry site survey acquired in April 2025. The block numbers traversed were 22/20, 22/19, 22/25.

2025, BP Exploration, NEP Phase 1 2DHR, Site Survey, DECC Reference Number GS_1853

An oil and gas industry seabed investigation for carbon storage site survey acquired under licence CS001 between March and April 2025. The block numbers traversed were 42/25, 43/21, 42/30, 43/26.

2019, BP Exploration, Clair South 2019 Geophysical Survey, Site Survey, DECC Reference Number GS_909

An oil and gas industry platform, route, seabed infrastructure, debris clearance site survey acquired under licences P165, P168, P169, P2125 between May and June 2019. The block numbers traversed...