Search directory

Filter by

1,602 results found

Epilepsy12 2025 National organisational and clinical audits - combined report on 2024 data

This is a combined report of the organisational and clinical audits for Round 4 Cohort 6, published in 2025. Epilepsy12, the UK collaborative clinical audit of health care for children and young...

Parental Leave (EU Directive) Regulations 2013: impact assessment

Analyses of both time-series (e.g. Labour Force Survey) and regular (e.g. Work-life Balance Employee and Employer surveys) datasets. Supports the impact assessment for draft regulations that extend...

Listed Buildings In Harborough District

A listed building is a building that has been placed on the Statutory List of Buildings of Special Architectural or Historic Interest. A listed building may not be demolished, extended, or altered...

WFD Surface Water Operational Catchments Cycle 2

Operational catchments are a way of grouping WFD waterbodies together for the purposes of economic appraisal. Every waterbody has been assigned to an Operational catchment. They are not always...

Immigration Statistics: extensions of stay

This release replaces the previous annual and quarterly publications Control of Immigration Statistics and the annual British Citizenship, following a public consultation. Each topic now has its...

Modern workplaces [consultation]: government response on flexible parental leave. Impact assessment.

Data supporting the impact assessment for proposals on extending flexible parental leave in the closed consultation on modern workplaces (URN 11/699). The new system of flexible parental leave aims...

Patient Reported Outcome Measures (PROMs) in England

PROMs measures health gain in patients undergoing hip replacement, knee replacement, varicose vein and groin hernia surgery in England, based on responses to questionnaires before and after...

Conservation areas

Location of conservation areas within Newcastle-upon-Tyne. Each of the conservation areas has a different character and quality which has led to its designation. Profiles of each conservation area...

DSSL Group Limited Maintenance for CCTV cameras contract

The London Borough of Barnet has entered into a contract with DSSL Group Limited. The contract is to provide maintenance for our CCTV cameras in the borough. DSSL Contract date 19 Jan 2022 to 18...

Data held in the BGS Laboratory Information Management System

The LIMS (Laboratory Information Management System) holds information about the sample preparation and chemical analysis of samples (from internal and external customers) handled by the BGS...

South Western Beam Trawl Survey, Qtr 1 (FSS: Q1SWBEAM)

Annual research vessel surveys in the Western English Channel using 4m beam trawls in support of EU data regulations and as part of an ICES funded research program. Randomly selected survey...

Boundary

In 2021, a complete airborne LiDAR survey of the Northern Ireland coastline was commissioned as part of the NI 3D Coastal Survey, providing precise and accurate data of the current coastal...

2021 NI 3D Coastal Survey - Topographic LiDAR - Digital Terrain Model

In 2021, a complete airborne LiDAR survey of the Northern Ireland coastline was commissioned as part of the NI 3D Coastal Survey, providing precise and accurate data of the current coastal...

2021 NI 3D Coastal Survey - Topographic LiDAR - Digital Terrain Model

In 2021, a complete airborne LiDAR survey of the Northern Ireland coastline was commissioned as part of the NI 3D Coastal Survey, providing precise and accurate data of the current coastal...

Footprint

In 2021, a complete airborne LiDAR survey of the Northern Ireland coastline was commissioned as part of the NI 3D Coastal Survey, providing precise and accurate data of the current coastal...

Digital Terrain Model

In 2021, a complete airborne LiDAR survey of the Northern Ireland coastline was commissioned as part of the NI 3D Coastal Survey, providing precise and accurate data of the current coastal...

2021 NI 3D Coastal Survey - Topographic LiDAR - Digital Terrain Model

In 2021, a complete airborne LiDAR survey of the Northern Ireland coastline was commissioned as part of the NI 3D Coastal Survey, providing precise and accurate data of the current coastal...

2021 NI 3D Coastal Survey - Topographic LiDAR - Digital Terrain Model

In 2021, a complete airborne LiDAR survey of the Northern Ireland coastline was commissioned as part of the NI 3D Coastal Survey, providing precise and accurate data of the current coastal...

2021 NI 3D Coastal Survey - Topographic LiDAR - Digital Terrain Model

In 2021, a complete airborne LiDAR survey of the Northern Ireland coastline was commissioned as part of the NI 3D Coastal Survey, providing precise and accurate data of the current coastal...

Digital Terrain Model

In 2021, a complete airborne LiDAR survey of the Northern Ireland coastline was commissioned as part of the NI 3D Coastal Survey, providing precise and accurate data of the current coastal...