Search directory

Filter by

675 results found

Solent Aggregates to Outreach

The Aggregates to Outreach project is funded by English Heritage through the Aggregates Levy Sustainability Fund (ALSF). The project spanned two phases: the first phase 1 (ALSF 3963) undertaken...

Solent Aggregates to Outreach

The Aggregates to Outreach project is funded by English Heritage through the Aggregates Levy Sustainability Fund (ALSF). The project spanned two phases: the first phase 1 (ALSF 3963) undertaken...

British Geological Survey (BGS) Geophysical Survey 2014/3: Loch Lomond (28/May/2014 to 23/Jul/2014)

This British Geological Survey (BGS) marine geophysical survey took place in Loch Lomond on board the RV White Ribbon. The aim was the analysis of glacial geomorphology and activity within the...

Urban Tree Cover 2013

This spatial dataset relates to Phase 3 (2013) and consists of 3 individual layers, being Points (individual trees), polygons (groups of trees) and urban extents (the extent of the study areas)....

Urban Tree Cover 2013

This spatial dataset relates to Phase 3 (2013) and consists of 3 individual layers, being Points (individual trees), polygons (groups of trees) and urban extents (the extent of the study...

Reproductive risk assessment for birds and mammals

Development of a practical phase-specific reproductive risk assessment for birds and mammals

Habitat point records from 1997 MNCR Scapa Flow (Orkney) sublittoral survey

MNCR Phase II survey Records currently considered sensitive have been removed from this dataset.

Species point records from 1997 MNCR Scapa Flow (Orkney) sublittoral survey

MNCR Phase II survey Records currently considered sensitive have been removed from this dataset.

Urban Tree Cover 2009

This spatial dataset relates to Phase 2 (2009) and consists of 4 individual layers, being Points (individual trees), polygons (groups of trees), urban extents (the extent of the study areas) and...

Urban Tree Cover 2006

This spatial dataset relates to Phase 1 (2006) and consists of 4 individual layers, being Points (individual trees), polygons (groups of trees), urban extents (the extent of the study areas) and...

Urban Tree Cover 2009

This spatial dataset relates to Phase 2 (2009) and consists of 4 individual layers, being Points (individual trees), polygons (groups of trees), urban extents (the extent of the study areas)...

Urban Tree Cover 2006

This spatial dataset relates to Phase 1 (2006) and consists of 4 individual layers, being Points (individual trees), polygons (groups of trees), urban extents (the extent of the study areas)...

Master Training Log

HMS TURBULENT. Ship's Company Training record for Phase 1, 2, and 3 Officer and Rating trainees.

School Exclusions

Data on school exclusions from 2003 - 2009, including reasons for exclusion, type of exclusion, school phase.

2013 Natural England Verification Survey of Torbay rMCZ-Intertidal Rock.

A Natural England commissioned verification survey of intertidal rocky reef within the Torbay rMCZ. Phase I Biotope mapping was carried out across the rMCZ for broad scale habitats. Phase II survey...

Hyndburn_Borough_Council_Town_Centre_Classification

Location of town centre shopping areas of individual towns in Hyndburn. This is Phase 2 INSPIRE compliant.

Macrolophus Identification

Optimising Macrolophus based Tuta absoluta Integrated Pest Management Strategy: Phase 1 - Identification of species on UK nurseries

UKCCSRC Call 1 Project: Tractable equations of state for CO2 mixtures in CCS: algorithms for automated generation and optimisation, tailored to end-users

This project will tackle one of the key technical challenges facing the development of commercially viable CO2 transport networks: modelling the phase behaviour of impure carbon dioxide, under the...

Woodland Grant Scheme

The Woodland Grant Scheme (WGS) provided incentives for people to create and manage woodlands on sites all over Wales. The scheme was run in 3 phases with the last phase ending in 2006. Woodland...

Woodland Grant Scheme

The Woodland Grant Scheme (WGS) provided incentives for people to create and manage woodlands on sites all over Wales. The scheme was run in 3 phases with the last phase ending in...