Important

We're planning improvements to this service. Help us learn what to change by completing a short survey.

Search results

Filter by

Remove filters

3,921 results found

GRAFFITI - Number of offensive issues dealt with that breached SLA target time (SLA set in 2016)

GRAFFITI - Number of offensive issues dealt with that breached SLA target time (SLA set in 2016)

UKCCSRC Call 1 project presentation: Multi-Phase Flow Modelling for Hazardous Assessment, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC (UK Carbon Capture and Storage Research Centre) Call 1 project, Multi-Phase Flow Modelling for Hazardous Assessment, was presented at the Cranfield Biannual,...

UKCCSRC Call 1 project poster: Multi-Phase Flow Modelling for Hazardous Assessment, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC (UK Carbon Capture and Storage Research Centre) Call 1 project, Multi-Phase Flow Modelling for Hazardous Assessment, was presented at the Cambridge Biannual, 02.04.14....

UKCCSRC Call 1 project poster: Multi-Phase Flow Modelling for Hazardous Assessment, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC (UK Carbon Capture and Storage Research Centre) Call 1 project, Multi-Phase Flow Modelling for Hazardous Assessment, was presented at the Cranfield Biannual, 21.04.15....

Cost effective methods to measure extent and condition of habitats: Earth Observation Phase 3

Report contains data that can be used under Open Government Licence. Phase 1 of the Making Earth observation work for conservation series of research projects created the Crick Framework, which...

2014 Natural England Phase I Sediment Verification Survey of the Alde, Ore and Butley SAC and rMCZ

Survey name:2014 Natural England Phase I Sediment Verification Survey of the Alde, Ore and Butley SAC and rMCZ This is a collation of surveys to gather data and evidence from a variety of marine...

2014 Natural England Phase II Sediment Verification Survey of the Alde, Ore and Butley SAC and rMCZ

Survey name: 2014 Natural England Phase II Sediment Verification Survey of the Alde, Ore and Butley SAC and rMCZ This is a collation of surveys to gather data and evidence from a variety of marine...

GRAFFITI - Number of non-offensive issues dealt with that breached SLA target time (SLA set in 2016)

GRAFFITI - Number of non-offensive issues dealt with that breached SLA target time (SLA set in 2016)

GreenbeltWithinGateshead_Phase1

Greenbelt - Gateshead - 2015

LocalWildlifeSites_Phase1

Local Wildlife Sites- Gateshead - 2015

GreenbeltWithinGateshead_Phase2

Greenbelt - Gateshead - 2015

PrimarySchoolCatchments_Phase2

Primary School Catchments - Gateshead - 2015

TreePreservationOrders_Phase2

Tree Preservation Orders - Gateshead - 2015

LocalWildlifeSites_Phase2

Local Wildlife Sites- Gateshead - 2015

NNPA Phase 1 Habitat Survey

Complete coverage of habitat types in Northumberland National Park, originally undertaken in 1992 then digitised later. Subsequently updated with patches of more up-to-date habitat information...

SchoolMainEntrances_Phase2

School Main Entrances - Gateshead - 2015

UrbanCoreBoundary_Phase2

Urban Core - Gateshead - 2015

Camden Cycle Counters Phase 2

Cycling in Camden is becoming ever more popular with the introduction of safe, convenient and protected routes. There are several cycle counters in Camden which provide counts of cyclists along...

Two-phase modeling of water partitioning between liquid iron and silicate melt (NERC Grant NE/S01134X/1)

The two-phase modeling of water between liquid iron and silicate melt at 50 and 135 gigapascals (corresponding to 3500 and 4200 kelvin) was performed by using ab initio molecular dynamics...

UKCCSRC Call 1 project poster: Multi-Phase Flow Modelling for Hazardous Assessment, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Multiphase flow modelling for hazard assessment of dense phase CO2 pipelines containing impurities was presented at the CSLF Call project poster reception,...