Search directory

Filter by

2,858 results found

Scottish Ferry Ports

This dataset represents passenger and vehicle ferry ports in Scotland. These are the start and end terminals for the Scottish Ferry Routes dataset. It was initially created for use within the...

NYMNPA Development Policy 23 - New Development and Transport

The Core Strategy and Development Policies Proposals Maps identify the protected linear routes which are the disused railway lines in the National Park. The policy seeks to protect linear routes...

2017, Zennor Petroleum Ltd, Finlaggan Rig Site Survey and Pipeline Route Survey, Site Survey, DECC Reference Number GS_575

An oil and gas industry semi-sub rig, pipeline, environmental site survey acquired under licence P2013 between June and July 2017. The block numbers traversed were 21/5, 22/1, 15/30.

Fife Cycle Network

Fife has one of the UK's most comprehensive cycling networks. Over 350 miles of sign posted cycle network includes a variety of leisure and commuting routes.Terrain varies from off road disused...

Priority 2 - Roads

Minor road gritting routes

OS Detailed Path Network

OS Detailed Path Network is a fully-connected, heighted path network covering Britain’s National Parks. Create off-road navigation apps, build exciting navigation websites and apps that help your...

Halton Public Rights of Way

A working copy of the Definitive Map and Statement, the legal record of Public Rights of Way (PROW). This dataset should not be used for legal purposes; the Public Right of Way data is essentially...

Priority 2 - Pavements

Minor road gritting routes for pavements

Accessibility Areas Interest

areas on interest relating to access route.

Proposed Enhanced Pedestrian Connections (Indicative)

Land protected for pedestrian routes and infrastructure.

Priority 1 - Roads (Precautionary)

First priority main road/high use gritting routes

2024, Petrofac Facilities Management Ltd, Belinda site and route survey (Block 21/30), Site Survey, DECC Reference Number GS_1693

An oil and gas industry semi-sub rig, seabed infrastructure, pipeline/umbilical, environmental site survey acquired between March and May 2024. The block number traversed was 21/30.

Priority 1 - Pavements

First priority main road/high use pavement gritting routes

Core Paths - Shetland Islands

Core Paths Plans were introduced by Part 1 of the Land Reform (Scotland) Act 2003. The purpose of the Plan is to designate a system of paths to provide the basic framework of routes (which are)...

Air Quality Management Area

Air Quality Management Areas for main routes in Wycombe District

TfL Cycle Superhighways

shows location of cycle routes and cycle hire stations in lambeth

Cycling

shows location of cycle routes and cycle hire stations in lambeth

London Cycle Hire Scheme

shows location of cycle routes and cycle hire stations in lambeth

Tfl Cycle Quietways

shows location of cycle routes and cycle hire stations in lambeth

Core Paths - South Ayrshire

Core paths, as the most important routes in the area, provide a basic framework of routes which meets community needs and minimises any potential conflict with land management operations. They...