Search results

Filter by

Remove filters

2,894 results found

Processed multibeam bathymetry grids from the Whittard Canyon (JC125, 2015).

Multibeam swath bathymetry data were collected with a hull-mounted Kongsberg EM120 and EM710 echosounder during RRS James Cook cruise JC125 (Chief Scientist Veerle Huvenne) from August-September...

Number of days taken to process Housing Benefit/Council Tax Benefit new claims and change events

Number of days taken to process Housing Benefit/Council Tax Benefit new claims and change events *This indicator is discontinued

NI 181 - Time taken to process Housing Benefit/Council Tax Benefit new claims and change events

The average time taken in calendar days to process all new claims and change events in Housing Benefit and Council Tax Benefit.

Spatial attendance data for immature common guillemots (Uria aalge) at four sites in a large breeding colony

This dataset contains data on the spatial attendance patterns of immature common guillemots (Uria aalge) at four sites in a large breeding colony. Data were collected from 25th April-12th May and...

UKCCSRC Call 1 project blog: Oxyfuel and EGR Processes in GT Combustion, Update, 01.11.13

This is a blog (Update, 01.11.13) on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project blog: Oxyfuel and EGR Processes in GT Combustion, Final, 01.08.14

This is a blog (Final, 01.08.14) on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion. Grant number: UKCCSRC-C1-26.

Presence and environmental data for the non-native common wall lizard (Podarcis muralis) in England, 2016-2018

The datasets contains species presence and background points, and their associated environmental data for non-native common wall lizard (Podarcis muralis). These data are included for local and...

High-precision isotopic constraints on the timescale of orogenic metamorphic and magmatic processes

This proposal aims at obtaining high-precision isotopic analyses on igneous and metamorphic phases at a length scale and precision necessary to resolve the timescales on which metamorphic and...

NI 181 Time taken to process Housing Benefit/Council Tax Benefit new claims and change events

The average time taken in calendar days to process all new claims and change events in Housing Benefit and Council Tax Benefit. Source: Department for Work and Pensions (DWP) Publisher: DCLG Floor...

Processed InSAR images over the volcanoes of the East African Rift (NERC Grant NE/L013649/1)

This data set contains a set of 20,740 unwrapped, geocoded interferograms derived from Sentinel-1 InSAR scenes processed over 63 volcanoes within the East African Rift system. A full description of...

COMMON.PLAN_ARTICLE_4_C3_TO_C4

Polygon boundary indicating where an Article 4 Direction approved by the Secretary of State requires a planning application for changing a current C3 (dwelling house) use to a C4 use (house of...

UKCCSRC Call 1 project presentation: Oxyfuel and EGR Processes in GT Combustion, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion, was presented at the GasCCS, 25.06.14. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project presentation: Oxyfuel and EGR Processes in GT Combustion, Cardiff Biannual, 11.09.15

This presentation on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion, was presented at the Cardiff Biannual, 11.09.15. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project presentation: Oxyfuel and EGR Processes in GT Combustion, GasCCS, 25.06.14

This presentation on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion, was presented at the GasCCS, 25.06.14. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project poster: Oxyfuel and EGR Processes in GT Combustion, Nottingham Biannual, 04.08.13

This poster on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion, was presented at the Nottingham Biannual, 04.08.13. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project poster: Oxyfuel and EGR Processes in GT Combustion, Sheffield Biannual, 08.04.13

This poster on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion, was presented at the Sheffield Biannual, 08.04.13. Grant number: UKCCSRC-C1-26.

Processed sidescan mosaics from Submarine structures in the mid-Irish Sea Area of Search

Processed sidescan mosaics from Submarine structures in the mid-Irish Sea Area of Search (CEND 11/08). This survey, carried out on the Cefas Endeavour research vessel, used acoustic data and...

UKCCSRC Call 1 Project: Oxyfuel and exhaust gas recirculation processes in gas turbine combustion for improved carbon capture performance

Conventional power generation in the UK faces a significant challenge in the face of decarbonising and maintaining a reliable, secure and cost effective electricity supply. The requirement for...

UKCCSRC Call 2 Project: Novel Materials and Reforming Processing Route for the Production of Ready-Separated CO2/N2/H2 from Natural Gas Feedstocks

The world's population is predicted to grow from the current 7 billions to a plateau of approximately 9.2 billions to be reached within the next 60 years, representing roughly a 30 % increase in a...

Processed SAR Data over Erta 'Ale Volcano, Afar, Ethiopia (NERC grant NE/L013649/1)

This dataset contains 204 ascending and 300 descending Sentinel-1 geocoded unwrapped interferograms and coherence, and 70 ascending and 102 descending Re-sampled Single Look Complex (RSLC) images...