Search directory

Filter by

2,517 results found

Fareham Local Plan 2037 Policies Map (Adopted April 2023)

The Fareham Local Plan 2037 (adopted April 2023) contains strategic priorities, policies and allocations which aim to achieve sustainable development in the Borough whilst also identifying and...

JSNA Executive Summary 2019

A Joint Strategic Needs Assessment (JSNA) is a way local authorities, the NHS and other public sector partners work together to understand the current and future health and wellbeing needs of the...

Habitat Networks (England) - Limestone Pavement

This is the record for Limestone Pavement which forms a part of the Habitat Networks (Individual) (England) dataset (link below). The habitat network maps are developed around 4 distinct habitat...

Gwent Levels - Resilient Ecological Networks

Resilient Ecological Networks (RENs), are networks of habitat linking protected sites and other biodiversity hotspots across the wider landscape, providing maximum benefit for biodiversity and...

Anglian Coastal Habitat Map 2021

This habitat map is derived from true colour ortho-rectified photography (25cm but resampled to 1m resolution for the segmentation process) captured for the Anglian Coastal Monitoring Programme...

Supporting data for the paper 'Small-scale capillary heterogeneity linked to rapid plume migration during CO2 storage' by S.J. Jackson and S. Krevor 2020 (NERC Grant NE/N016173/1)

Supporting data for the paper 'Small-scale capillary heterogeneity linked to rapid plume migration during CO2 storage'. We supply experimental, analytical and numerical simulation data used in the...

National Forest Inventory - 50-year forecast of hardwood availability GB 2014

An NFI statistical report examining the potential for hardwood timber availability over the period 2013-2061 under a range of harvesting and restocking scenarios. The spreadsheet provides all the...

National Forest Inventory - 25-year forecast of coniferous volume and increment GB 2012

An NFI statistical analysis report of the 25-year forecast of standing coniferous volume and increment for Great Britain. The spreadsheet provides all the data found in the main report plus...

Homelessness

Levels of homelessness households in temporary accommodation Source: Communities and Local Government (CLG) Publisher: Neighbourhood Statistics Geographies: Local Authority District (LAD),...

National Forest Inventory - 50-year forecast of softwood availability GB 2014

An NFI statistical report for GB, examining the potential for softwood timber availability over the period 2013-2061 under a range of harvesting and restocking scenarios. The spreadsheet provides...

basildon_cs2012_padc6

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc10

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc1

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc12

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc11

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc13

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc2

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc3

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc4

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc7

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...