Important

We're planning improvements to this service. Help us learn what to change by completing a short survey.

Search results

Filter by

Remove filters

378 results found

Modern workplaces [consultation]: government response on flexible parental leave. Impact assessment.

Data supporting the impact assessment for proposals on extending flexible parental leave in the closed consultation on modern workplaces (URN 11/699). The new system of flexible parental leave aims...

Housing Benefit / Council Tax Benefit Speed of Processing

Statistics on the average number of days to process (i) new (ii) change of circumstances of HB / CTB claims. Note: Prior to Oct 2011 this was named HB/CTB Right Time Indicator. DWP stopped...

Hackney Article 4 Directions - Flexible Town Centre Use

Article 4 Direction (A4D) is part of planning legislation that allows the Council to remove permitted development rights including changes of use from an area or a particular property. This dataset...

Risk of Flooding from Reservoirs - Maximum Flood Speed (Web Mapping Service)

This dataset is now retired and replaced with the following: Reservoir Flood Extents - Fluvial Contribution (National) https://environment.data.gov.uk/dataset/db114020-465a-412b-b289-be393d995a75...

Risk of Flooding from Surface Water - Speed - Climate Change 1

Risk of Flooding from Surface Water (RoFSW) map is an assessment of where surface water flooding may occur when rainwater does not drain away through the normal drainage systems or soak into the...

Compass High Speed Rail HS2 Web Map Portal

This is our internet map portal/service for sharing all GIS datasets for the High Speed Rail (HS2) project, as the line impacts Warwickshire and the surrounding countryside. The vast majority of...

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Update, 06.03.14

This is a blog (Update, 06.03.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Workshop1, 30.04.14

This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1ES, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1ES, 30.04.14. Grant number: UKCCSRC-C1-40.

PSNI fixed penalties and speed courses for motoring offences 2017 - 2022

The PSNI produces statistics on motoring offences that are detected by the police. Motoring offences can be dealt with by issuing a fixed penalty notice (FPN), attendance at a speed awareness...

UKCCSRC Call 1 Project: FleCCSnet - Flexible CCS Network Development

This project will produce and disseminate the first design and operating guidelines for the flexible operation of CCS pipeline networks. The research will explore how CCS pipeline networks can...

Risk of Flooding from Surface Water Speed: 1 percent annual chance

PLEASE NOTE: This record has been retired. It has been superseded by: https://environment.data.gov.uk/dataset/b5aaa28d-6eb9-460e-8d6f-43caa71fbe0e This dataset is not suitable for identifying...

Flexible Resourcing Records

Recruitment - matching skills profiles and availability to identify candidates with the right skills.

Flexible Deployment Tool

Timesheet allocation of hours on variety of projects. Competency Self-Assessments. Only name, position and time allocations & self-assessments held within.

UKCCSRC Call 2 project poster: Towards more flexible power generation with CCS, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 2 project, Towards more flexible power generation with CCS, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C2-214.

PSNI fixed penalties, speed and safer driver courses for motoring offences 2020 – 2024

The PSNI produces statistics on motoring offences that are detected by the police. Motoring offences can be dealt with by issuing a fixed penalty notice (FPN), attendance at a speed awareness...