Search directory

Filter by

34,946 results found

Q 98

PDF map of quadrant 98

Strategic Site Allocations Core Strategy 2014 Policies B3A KE3A KE4A RA5

Core Strategy adopted 2014 Policies B3A KE3A KE4A RA5. Defines the boundary of large strategic sites allocated principally for residential development on the edge of Bath, Keynsham and Whitchurch.

People who have a follow-up assessment between 4 and 8 months after initial admission for stroke (CCGOIS 3.8)

The percentage of people who have a follow-up assessment between 4 and 8 months after initial admission for stroke. Current version updated: Sep-17 Next version due: Sep-18

4-8 Sedgemere Road Hearing Documents

Documents from the public hearing for the planning application at 4-8 Sedgemere Road, including the decision notice. See also the EA consultation documents.

CS Policy SP4B

Area subject to Spatial Policy 4B in the Core Strategy Development Plan Document (CS DPD)

Celtic Sea And Western Channel Plankton Survey - RV Corystes 03/88

This survey was carried out between 16th-28th June 1988 in the Celtic Sea and Western English Channel with the aim of investigating the contribution of 1-3 year old mackerel to total egg...

Celtic Sea And Western Channel Plankton Survey - RV Corystes 03/88

This survey was carried out between 16th-28th June 1988 in the Celtic Sea and Western English Channel with the aim of investigating the contribution of 1-3 year old mackerel to total egg...

Hydrodynamic data from across a mangrove restoration site in the Red River Delta, Vietnam, 2022

This dataset contains acceleration data measured from 19 low-cost and open-source bottom-mounted floats called 'Mini Buoys', to identify hydrological conditions associated with thriving and failing...

Saved Local Plan Policy B8 - Residential Protection Areas

Sitea allocated for Residential Protection Areas under the Saves Local Plan policy B8. Areas are recorded as a polygon. Upon accessing this Licensed Data you will be deemed to have accepted the...

TWBC Local Plan 2006 - Retail/Mixed Use Deveplopment CR4(a)-(e), CR6, CR8, CR10

TWBC Local Plan 2006 - Retail/Mixed Use Deveplopment CR4(a)-(e), CR6, CR8, CR10

% of non-major applications determined within 8 Weeks (NPI157b)

% of non-major applications determined within 8 Weeks (NPI157b)

2018, Apache, Storr EBS Survey, Block 9/19, Pipeline/Cable Route Survey, DECC Reference Number GS_702

An oil and gas industry pipeline route site survey acquired under licences P103, P1986 in April 2018. The block number traversed was 9/19.

Output Area (2011) to County and Unitary Authority (December 2016) Best Fit Lookup in EN

This is a best fit lookup between 2011 Output Areas (OA) and counties/unitary authorities as at 31 December 2016 in England.  (File Size - 17 MB)Column Descriptions: OA11CD | Text |...

Chemical composition of anaerobic digestate and biomass ash blends as a result of storage

The dataset contains the chemical compositional changes occurred in anaerobic digestate, with and without biomass ash, simulating storage conditions during 128 days. Additionally, Sulphuric Acid...

Species point records from 1987-88 MNCR Berwick to Beadnell and the Farne Islands survey

The survey area between Berwick and Beadnell lies on the North Sea coast just south of the Scottish border. It includes Holy Island and Budle Bay. The area is essentially rural and attracts a...

Habitat point records from 1987-88 MNCR Berwick to Beadnell and the Farne Islands survey

The survey area between Berwick and Beadnell lies on the North Sea coast just south of the Scottish border. It includes Holy Island and Budle Bay. The area is essentially rural and attracts a...

Economic impact of West Yorkshire museums

In 2014/15 the West Yorkshire Local Authority Partnership measured the economic impact of the museums in the region using the AIM (Association of independant museums) methodology.  The data...

LSOA (2001) to Electoral Ward (December 2007) Best Fit Lookup in EW

A best fit lookup between 2001 lower layer super output areas (LSOA) and electoral wards/divisions as at 31 December 2007.  (File Size - 2 MB) For more information and an overview of...

Average Progress 8 score from Key Stage 2 to Key Stage 4

Average Progress 8 score from Key Stage 2 to Key Stage 4 Progress 8 is a measure of attainment progress made by pupils between Key Stage 2 (age 10-11) and selected subjects at GCSE (age 15-16). ...

Survey : SUZA 1/88 (part of English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D))

This survey was undertaken by Cefas as part of the English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D); Station, catch, length (all species) and biological data (selected...