Search directory

Filter by

1,481 results found

Aberdeen Air Quality - NO2 Diffusion Tubes

Tubes measure nitrogen dioxide levels at their location. Used to identify any pockets of air pollution and provide indication of exposure levels.

air_quality_continuous_assessment_no2

Individual NO2 (Nitrogen Dioxide) passive diffusion tubes captured as points using Ordnance Survey MasterMap. NO2 levels on busy roads throughout the borough are monitored using passive diffusion...

Clocaenog Forest Red Squirrel Abundancy data 2023

This study involved the assessment of red squirrel occupancy and habitat preferences within Clocaenog Forest. A stratified random sampling strategy was employed, along with a ‘targeted’ survey to...

Red rated Large Projects - CYC

Red rated Large Projects - CYC. RAG (red-amber-green) project rating is used in project management for indicating the progress of projects. This measure shows the number of council's large...

Business continuity plans

Yorkshire and Humber Relationship Team Business continuity plans

EWCO Biodiversity - Priority Species - Red Squirrel - Woodland Creation

Spatial data supporting the England Woodland Creation Offer (EWCO) additional contribution targeting for Nature Recovery. This layer is identical to that titled ‘CS WCM Biodiversity - Priority...

Business Continuity plan

Business Continuity plan to be facilitated in the event of an emergency.

Continuous Analysers Locations

This data has come from continuous analysers. It includes PM10, PM2.5 and Nox data...

Bathymetric LiDAR for Red Bay

Small test site for combined bathymetric and topographic LiDAR in Red Bay, surveyed January 2006. Data were tidally corrected using UK Hydrographic Office "Total Tide" software and cleaned in Caris...

Business Continuity Plans repository

Business Continuity Plans repository

Business continuity/emergency plans

Business Continuity/Emergency Plans - CD staff contact details. Name, out of hours contact telephone numbers.

Engineering geology of tropical red clay soils

Dataset comprises the results of a study into the engineering geological characteristics of tropical red clay soils, funded by the Overseas Development Administration. The geotechnical properties...

NHS Continuing Healthcare Activity

NHS Continuing Healthcare’ is a package of care (outside hospital) arranged and funded solely by the NHS where the individual has been found to have a ‘primary health need’ as set out in the...

ContinuousMonitoringStations_SG

Local air quality monitoring stations that continuously monitor various pollutants including nitrogen dioxide, particulate matter (PM10) and ozone within the Local Air Quality Management (LAQM)...

2023 DAERA Red Bay SAC Subtidal Survey

The survey was carried out to assess the condition of the Red Bay SAC subtidal sandbank feature and maerl sub-feature. It used UWTV and sediment grab sampling, MBES mapping was also carried...

Continuous Household Survey Bulletin

The Bulletin provides summary information as well as some trend data from previous years. It includes information on - smoking, household composition, debt, internet access, health, sport and...

Local Air Quality Monitoring - Continuous Assessment

Air quality monitoring stations that continuously monitor NO2 within the LAQM area.

DTrgA Business Continuity Call Out List

Business Continuity Call Out List

Continuous measurements of rainfall (2002-2007) [LOCAR]

Continuous measurements of rainfall from the Frome Piddle; Pang Lambourn and Tern catchments, recorded between 2002 and 2007. Continuous recording rain gauges were installed at six sites in these...

London Site Business Continuity Contact Data

A data set in two parts - one in MS WORD, the other in MS EXCEL - that contains: names; telephone numbers (business telephone numbers, home telephone numbers, mobile telephone numbers, pager...