Filter by
2,790
results found
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
Text files of physical parameters controlled or measured in rock heating and deformation experiments; jpg and tif files of optical and electron microscope images of experimental products; xome xlsx...
- Published by:
- Environmental Information Data Centre
- Last updated:
- 14 May 2026
This dataset contains results from in situ field measurements of riverbed nitrogen transformations in the Hammer Stream, a sandy tributary of the River Rother in West Sussex, UK. Measurements were...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
PROJECT DETAILS ONLY - NO DATA. 1. Introduction 2. Geophysical database 3. Large-scale seismic interpretation 4. Large-scale glacial environment 5. 3D seismic investigations - Elephant Field 6. 3D...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
UKGEOS and Core Sample Analysis. Geomechanical testing was performed to determine triaxial compressional strength, tensile strength, frictional strength and permeability of sandstones, siltstones,...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
The dataset contains the outputs from 3D spherical incompressible mantle convection models. Included outputs, such as visualisation files (to use with open-source software ParaView), allow to...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
Included video files are visualisations of the temporal evolution of the following 3D spherical mantle convection models: 05_depltd, 03_depltd, 07_depltd, 1_22_visc, 3_22_visc, no_lid_visc,...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 14 April 2026
This dataset records the principal factors responsible for causing individual bird species to decline, suppressing their numbers or restricting their ranges. In accordance with the EU guidelines,...