Search results

Filter by

Remove filters

1,779 results found

Business Continuity plan

Business Continuity plan to be facilitated in the event of an emergency.

NI 178a - Bus services running on time - Proportion running on time

Proportion running on time and excess waiting times for bus services. Punctuality is generally measured according to the guidance provided by the Department for Transport on the CLIP website.

Continuous Analysers Locations

This data has come from continuous analysers. It includes PM10, PM2.5 and Nox data...

Business Continuity Plans repository

Business Continuity Plans repository

Continuous Household Survey 2008/09

This report presents findings from the carers’ module of the Continuous Household Survey (CHS), carried out over the year 1st April 2008 – 31st March 2009. The CHS provides a regular source of...

Import demand: long run income elasticities

Results presented in BIS research paper no. 144 Long run income elasticities of import demand.

Business continuity/emergency plans

Business Continuity/Emergency Plans - CD staff contact details. Name, out of hours contact telephone numbers.

NHS Continuing Healthcare Activity

NHS Continuing Healthcare’ is a package of care (outside hospital) arranged and funded solely by the NHS where the individual has been found to have a ‘primary health need’ as set out in the...

ContinuousMonitoringStations_SG

Local air quality monitoring stations that continuously monitor various pollutants including nitrogen dioxide, particulate matter (PM10) and ozone within the Local Air Quality Management (LAQM)...

Continuous Household Survey Bulletin

The Bulletin provides summary information as well as some trend data from previous years. It includes information on - smoking, household composition, debt, internet access, health, sport and...

Geohazard Assessment of Running Sand Deposits

**No longer exists - now part of GeoSure**An assessment of the potential for a geological deposit to show running sand behaviour under the action of flowing water. A characteristic usually of...

GeoSure Running Sand Deposits

The GeoSure data sets and reports from the British Geological Survey provide information about potential ground movement or subsidence in a helpful and user-friendly format. The reports can help...

NI 178 - Bus services running on time

Proportion running on time and excess waiting times for bus services. Punctuality is generally measured according to the guidance provided by the Department for Transport on the CLIP website.

Local Air Quality Monitoring - Continuous Assessment

Air quality monitoring stations that continuously monitor NO2 within the LAQM area.

Individual Electoral Registration: Confirmation Dry Run Data

Data details the results of the confirmation dry run (CDR), a test of the confirmation process which will be the first step in transition to Individual Electoral Registration. The full evaluation...

NI 178 - Bus services running on time

Proportion running on time and excess waiting times for bus services. Punctuality is generally measured according to the guidance provided by the Department for Transport on the CLIP...

DTrgA Business Continuity Call Out List

Business Continuity Call Out List

Running sand dataset (5km Hex-Grid) version 7

The 5km Hex GS Running Sand dataset shows a generalised view of the GeoSure Running Sand v7 dataset to a hexagonal grid resolution of 64.95km coverage area (side length of 5km). This dataset...

Running sand dataset (5km Hex-Grid) version 8

The 5km Hex GS Running Sand dataset shows a generalised view of the GeoSure Running Sand v8 dataset to a hexagonal grid resolution of 64.95km coverage area (side length of 5km). This dataset...

Continuous measurements of rainfall (2002-2007) [LOCAR]

Continuous measurements of rainfall from the Frome Piddle; Pang Lambourn and Tern catchments, recorded between 2002 and 2007. Continuous recording rain gauges were installed at six sites in these...