Search directory

Filter by

1,401 results found

Moray Onshore Wind Energy 2017 Policy Guidance Map for Large Typologies (Moray)

Areas of Greatest Potential. Scottish Planning Policy states that planning authorities “should identify where there is strategic capacity for wind farms, and areas with the greatest potential for...

2011, Antrim Energy, East Fyne, Semi-Sub Rig, DECC Reference Number 2507

An oil and gas industry site survey for a semi-sub rig acquired under licence P077 between April and May 2011. The block numbers traversed were 21/28a and 21/29.

2011, Ithaca Energy (UK) Ltd, Harrier, Site Survey, DECC Reference Number 2486

An oil and gas industry site survey acquired in April 2011. The UKCS block number traversed was 30/6.

2011, Ithaca Energy (UK) Ltd, Hurricane, Site Survey, DECC Reference Number 2481

An oil and gas industry site survey acquired in April 2011. The UKCS block number traversed was 29/10.

2011, Ithaca Energy (UK) Ltd, Stella, Site Survey, DECC Reference Number 2483

An oil and gas industry site survey acquired in April 2011. The UKCS block number traversed was 30/6.

Modelled Miscanthus yield and soil carbon change data for the tropics (2040-2049) and Europe (2090-2099)

This dataset contains potential yields of Miscanthus and changes to soil carbon storage resulting from Miscanthus cultivation. The purpose of this study was to evaluate and compare diverse...

EU Project: CO2CARE - CO2 Site Closure Assessment Research

The CO2CARE (CO2 Site Closure Assessment REsearch) project focused on site closure and preparation for transfer of liability of a CO2 storage project in order to assist regulatory authorities and...

CAP UK Payments Public storage transactions as contained within the Market Scheme data 2009

Amounts received by UK beneficiaries under the Common Agricultural Policy (CAP). The information is published annually (30th April) to meet the requirements of Commission Regulation (EC) No...

UKCCSRC Call 1,2 paper: Understanding the solubility of water in carbon capture and storage mixtures: An FTIR spectroscopic study of H2O+CO2+N2 ternary mixtures

The solubility of water (H2O) in carbon dioxide (CO2) and nitrogen (N2) mixtures (xN2 = 0.050 and 0.100, mole fraction) has been investigated at 25 and 40 degrees C in the pressure range between 8...

UKCCSRC Call 1/2 paper: Understanding the solubility of water in carbon capture and storage mixtures: An FTIR spectroscopic study of H2O+CO2+N2 ternary mixtures

The solubility of water (H2O) in carbon dioxide (CO2) and nitrogen (N2) mixtures (xN2 = 0.050 and 0.100, mole fraction) has been investigated at 25 and 40 °C in the pressure range between 8 and 18...

Moray Onshore Wind Energy 2017 Policy Guidance Map for Small-Medium Typologies (Moray)

Areas of Greatest Potential. Scottish Planning Policy states that planning authorities “should identify where there is strategic capacity for wind farms, and areas with the greatest potential for...

Moray Onshore Wind Energy 2017 Policy Guidance Map for Small-Medium Typologies (Moray)

Areas of Greatest Potential. Scottish Planning Policy states that planning authorities “should identify where there is strategic capacity for wind farms, and areas with the greatest potential for...

2013, Talisman Sinopec Energy (UK) Ltd, Shaw, Site Survey, DECC Reference Number 3144

An oil and gas industry site survey acquired under licences P291, P1800 in September 2013. The block numbers traversed were 22/22a, 22/23d, 22/22d.

2013, Talisman Sinopec Energy (UK) Ltd, Andromeda, Site Survey, DECC Reference Number 3098

An oil and gas industry site survey acquired under licence P1880 between August and September 2013. The block number traversed was 29/20a.

2013, Talisman Sinopec Energy (UK) Ltd, Highlander, Site Survey, DECC Reference Number 3099

An oil and gas industry site survey acquired under licence P324 between July and September 2013. The block number traversed was 14/20b.

2013, Talisman Sinopec Energy (UK) Ltd, UTBW, Site Survey, DECC Reference Number 3137

An oil and gas industry site survey acquired under licences P324, P257, P218, P588, P237 in September 2013. The block numbers traversed were 14/20a,14/20b,14/25a,15/21a,15/21c,15/16a,15/16c.

2010, Xcite Energy Resources Ltd, Bentley, Jack-Up Rig, DECC Reference Number 2186

An oil and gas industry site survey for a jack-up rig acquired under licence P1078 between March and April 2010. The block number traversed was 9/3b.

2011, Xcite Energy Resources Ltd, Bentley, Jack-Up Rig, DECC Reference Number 2546

An oil and gas industry site survey for a jack-up rig acquired under licence P1078 in August 2011. The block number traversed was 9/3b.

2013, Talisman Sinopec Energy (UK) Ltd, Scapa, Site Survey, DECC Reference Number 3102

An oil and gas industry site survey acquired under licences P249, P1768 between July and September 2013. The block numbers traversed were 14/19n, 14/19s, 14/19.

UKCCSRC Call 2 project poster: Quantifying Residual and Dissolution Trapping in the CO2CRC Otway Injection Site, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Quantifying Residual and Dissolution Trapping in the CO2CRC Otway Injection Site was presented at the CSLF Call project poster reception, London, 27.06.16....