Search directory

Filter by

592 results found

Evaluation of Regional Slope Stability of the European Continental Margin - Aspect Bathymetry Grids

PROJECT DETAILS ONLY - NO DATA. There is a large deal of uncertainty as to the levels of stabilty of slope components of the European margin, other than localised detailed surveys completed using...

Evaluation of Regional Slope Stability of the European Continental Margin - Seismic Profile Lines

PROJECT DETAILS ONLY - NO DATA. There is a large deal of uncertainty as to the levels of stabilty of slope components of the European margin, other than localised detailed surveys completed using...

Evaluation of Regional Slope Stability of the European Continental Margin - Bathymetry 500m Grid

PROJECT DETAILS ONLY - NO DATA. There is a large deal of uncertainty as to the levels of stabilty of slope components of the European margin, other than localised detailed surveys completed using...

Evaluation of regional slope stability of the European Continental Margin - Slope Risk Analysis

PROJECT DETAILS ONLY - NO DATA. There is a large deal of uncertainty as to the levels of stabilty of slope components of the European margin, other than localised detailed surveys completed using...

Evaluation of Regional Slope Stability of the European Continental Margin - Shapefiles

PROJECT DETAILS ONLY - NO DATA. There is a large deal of uncertainty as to the levels of stabilty of slope components of the European margin, other than localised detailed surveys completed using...

Evaluation of Regional Slope Stability of the European Continental Margin - Contours

PROJECT DETAILS ONLY - NO DATA. There is a large deal of uncertainty as to the levels of stabilty of slope components of the European margin, other than localised detailed surveys completed using...

Evaluation of Regional Slope Stability of the European Continental Margin

PROJECT DETAILS ONLY - NO DATA. There is a great deal of uncertainty as to the levels of stability of slope components of the European margin, other than localised detailed surveys completed using...

UKCCSRC Call 2 Project: Process-performance indexed design of task-specific ionic liquids for post-combustion CO2 capture

Increased population and increased economic activity have one important thing in common: increased energy demand. More and more, concern is mounting surrounding the broader environmental impact...

Management Strategy Evaluation toolkit for Ecopath with Ecosim (model output and technical report)

This dataset consists of output from a computer model that predicts responses of 69 functional groups from plankton to whales to changing fishing pressure. Scenarios are run using the newly built...

Management Strategy Evaluation toolkit for Ecopath with Ecosim (model output and technical report)

This dataset consists of output from a computer model that predicts responses of 69 functional groups from plankton to whales to changing fishing pressure. Scenarios are run using the newly built...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 05: FEED Decisions Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Clean Air Consultation – July 2016

On his election in 2016, the Mayor committed to a large scale consultation on a range of actions to address poor air quality in London. Measures under consideration include implementing the Ultra...

Dundee Local Development Plan

The Dundee Local Development Plan 2019 sets out the land use strategy that will guide development across Dundee up to 2029 and beyond. Since the previous local development plan Dundee has...

Diatom Silica Oxygen Isotope Records from the Late Quaternary Antarctic Margin (NERC lead grant NE/G004811/1, child grant NE/G00413)

Antarctica and its ice sheets have played, and continue to play, a major role in the global ocean-atmosphere system, hence, it is critical that we have a sound understanding of the past behaviour...

2003 Strategic Environmental Assessment SEA4 Technical report - Cephalopods (north UKCS)

This report is a contribution to the Strategic Environmental Assessment (SEA4) conducted by the Department of Trade and Industry (now Department of Energy and Climate Change) and provides an...

2002 Strategic Environmental Assessment SEA3 Technical report - Cephalopods (Addendum to SEA2 report), North Sea

This report is a contribution to the Strategic Environmental Assessment (SEA3) conducted by the Department of Trade and Industry (now Department of Energy and Climate Change) and is an addendum to...

2001 Strategic Environmental Assessment SEA2 Technical report - Cephalopods, covering overview of cephalopod population, ecology, fisheries, sensitivity in the North Sea

This report is a contribution to the Strategic Environmental Assessment (SEA2) conducted by the Department of Trade and Industry (now Department of Energy and Climate Change). SEA2 focuses on the...

Front Street Improvements

Front Street is an important high street in Acomb, York. It plays a vital role in the community and the wider city and is home to many established and well-loved local independent retailers and...

Forestry England Recreation Routes

The usage, name and grade of the series of recreation segments that link together to form linear recreation features, for example, mountain bike trails or walking trails. Primary Route...

Microplastic contamination data from mussels from the UK in 2022

This dataset records microplastic (MP) contamination in mussels from the UK (7 stations around England and Wales) collected in November 2022. Data includes MP load per mussel, recorded per...