Search directory

Filter by

6,013 results found

basildon_open_space_sportcentres

The dataset shows the area of Sports Centres used in the Basildon Borough Open Space Assessment. Public Sector End User Licence –...

Settlement Boundaries

Urban and Rural Settlement Boundaries within the Kettering Borough based on the Local Plans. For personal, non-commercial use only. Upon accessing this Licensed Data you will be deemed to have...

basildon_open_space_naturalandseminaturalspaces

The dataset shows the area of Natural and Semi Natural Open Spaces used in the Basildon Borough Open Space...

National Trip End Model (NTEM)

The [freely available TEMPro software is required to view these datasets](https://www.gov.uk/government/publications/tempro-downloads). The National Trip End Model (NTEM) model forecasts the...

2016, Total E&P UK Ltd, Q1 2016 Elgin WHP A South Debris Survey. UKCS Block 22/30c, Debris Clearance Survey, DECC Reference Number GS_392

An oil and gas industry debris clearance site survey acquired under licence P666 between February and March 2016. The block number traversed was 22/30.

2018, Total E&P UK Ltd, 2018 Ballechin Rig Site Survey 214/27b 214/28a 214/28b WOS, Site Survey, DECC Reference Number GS_784

An oil and gas industry rig site survey acquired under licence P2405 between September and October 2018. The block numbers traversed were 214/27b, 214/28a, 214/28b.

Organogram of Staff Roles & Salaries

Organogram (organisation chart) showing all staff roles. Names and salaries are also listed for the Senior Civil Servants. Organogram data is released by all central government departments and...

basildon_cs2012_majorurbanarea

The dataset was used in the development of the Core Strategy 2012 and shows the rough boundaries of Major Urban Area of Basildon...

sea_amenity_sites_2008

The sustainable environmental assessment defined where development within Basildon Borough met other developments. This layer isolated the known amenity sites for this period...

Organogram of Staff Roles & Salaries

Organogram (organisation chart) showing all staff roles. Names and salaries are also listed for the Senior Civil Servants. Organogram data is released by all central government departments and...

List of Internal Drainage Boards

Please note: This catalog/data-sets has now been superseded by the the record titled: Association of Drainage Authorities: Administrative Boundaries - Internal Drainage Districts in England. This...

Ordnance Survey Code-Point Open

September 2017 OS Code-Point Open for Greater London and London boroughs are downloadable via the links below.OS Code-Point Open provides a National Grid coodinate for a point within each postcode...

Seismic interpretation of force fold structures from the Glencoe 3D seismic reflection survey, NW Australia

This dataset contains a petrel project and associated horizon grid, surface, and point data interpreted using the Glencoe 3D seismic reflection survey as part of the NERC Pushing the Frontiers...

NHS Postcode Directory for the UK Extract (November 2017)

This file contains the 'Extract' NHS Postcode Directory (NHSPD) as at November 2017. The NHSPD relates both current and terminated postcodes in the United Kingdom to a selection of health...

basildon_cs2012_padc6

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc10

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc1

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc12

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc11

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc13

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...