Important

We're planning improvements to this service. Help us learn what to change by completing a short survey.

Search results

Filter by

Remove filters

2,244 results found

Reinstatement Line

A feature which has a line / curve geometry and defines the standard the path must be restored to following opening due to works in the highway, as defined in the New Roads and Street Works Act...

NELA-Second Patient Report Hospital Level data

Hospital Level Data for the Second Patient Audit Report of the National Emergency Laparotomy Audit. Data was collected between December 2014 and November 2015.

Highway Planning Lines

The area of Highway Planning Lines safeguarded for road improvements within Nottingham City, indicating areas of land required to deliver transport schemes.

% of external calls answered within 20 seconds - CYC

% of external calls answered within 20 seconds - CYC. This quarterly figure shows the council's speed of reaction by calculating the percentage of number of calls answered within 20 seconds out of...

Inter Tidal Line

A watercourse that extends across the inter tidal zone, represented as a line. (This abstract has been padded to load into the catalogue)

YCC & Benefits % Calls answered in 20 seconds - TOTAL

YCC & Benefits % Calls answered in 20 seconds - TOTAL

Maintenance Line

A feature which has a line / curve geometry and provides information about whether the road is maintained at public expense by a national or local highway authority, a road authority or is...

Rochford Power Lines

This dataset shows the location of Power Lines within the Rochford District. Upon accessing this Licensed Data you will be deemed to have accepted the terms of the Public Sector End User Licence –...

Teaching Line Candidate Database

The Teaching Line database is used to provide personalised information and support to those interested in a career in teaching, to convert interest into application in line with NCTL key...

Second Land Utilisation Survey of Britain

The late Professor Alice Coleman (1924-2023) directed the Second Land Utilisation Survey of Britain (2LUSB) between 1960 and 1973. This was developed from Prof Sir Dudley Stamp’s first such survey...

Rail Line Upgrading (Indicative)

Areas of land safeguarded for future raill line upgrading.

Local Plan Macclesfield Line

Line data to indicate sites within Macclesfield Borough Local Plan

Care Information Choices

Data on patient opt-out information received from GP Practices. There are two types of opt-out: * A type 1 opt-out prevents information being shared outside a GP practice for purposes other than...

% of web chats engaged within service level (20 seconds)

% of web chats engaged within service level (20 seconds)

B-Lines East

Polygon of Eastern network for Buglife's national B-Lines initiativeto focus the creation/restoration of wildflower habitats and help reverse pollinator declines. The East network includes 3km...

Health Management On-Line Portal

The Health Management On-Line Portal is database for referring and tracking occupational health referrals by Animal Health and Veterinary Laboratories Agency (AHVLA) line managers.

Number of external calls answered within 20 seconds - CYC

Number of external calls answered within 20 seconds - CYC *This indicator has been discontinued.

Results from the Second Survey of Investment in Intangible Assets

Article describing key findings from the second Survey of Investment in Intangible Assets. Source agency: Office for National Statistics Designation: Supporting material Language:...

Norfolk Highways Centre Line Network

The Norfolk highways centre line network data is a digital representation of the centre lines of all the roads in Norfolk that are maintainable at public expense by Norfolk County...

Broads Authority Centre Line

Linear dataset depicting the centre of water bodies and channels within the Broads Authority Executive Area. For navigable waters the line follows the centre of the navigation channel.