Search directory

Filter by

362 results found

An Experimental Study of the Stability of Hydrous Phases at High Pressures Implications for H2O Storage and Release in Subduction Zones

PROJECT DETAILS ONLY - NO DATA. To determine the p-t stability of hydrous phases in ultramafic compositions in subduction zones, and the conditions at which h2o is released from subducting slabs in...

Data associated with 'Rapid trans-crustal magma movement under Iceland' by Mutch et al. (2019) (NERC grant NE/L002507/1)

Primary data, model initial conditions, model results, a compiled database of olivine diffusivity experiments and supplementary tables used in the paper: 'Mutch, E. J. F., Maclennan J., Shorttle,...

Water Node

The location where a connected area of permanent water ends, where an area of permanent water is connected to two or more other areas of permanent water, or where a recorded attribute changes for...

Road Link

A Road Link is a linear spatial object that defines the geometry and connectivity of a road network between two points in the network. Road Links can represent single carriageways, dual...

Licensed Premises Data

Data about licences issued in the Borough To view each licensed premises on our interactive map, please click the following...

Licensed Premises Data

Data about licences issued in the Borough To view each licensed premises on our interactive map, please click the following...

Fraud

Supporting Notes 1. The Council has not used powers under the Prevention of Social Housing Fraud (Power to Require Information) (England) regulations 2014 or similar powers as the Council does not...

Rail stakeholder database

Names and addresses of approx 1400 bodies connected with the rail industry.

Internet Access

This release explores the use of the Internet by adults in Great Britain and draws attention to how households connected to the Internet. It provides useful information for those interested in what...

AU_S_TEPConnectivityPriorityMask_POLY_CURRENT

Green Infrastructure in Cheshire East. The file contains a mask for Connectivity Priority Areas.

Evaluation - Invasive species

Evaluation of the risks associated with increasing landscape connectivity for the spread of invasive species

Assembly Member Gifts and Hospitality Register

Register of any gift or hospitality worth £25 or over received by Assembly Members in connection with their official dutiesSince 12 September 2007, when the Authority adopted a new Code of Conduct,...

Eco Corridor - Aspirational Links

Corridors which improve connectivity between core areas enabling species to move, feed, disperse, migrate or reproduce

Water Link

A network representation of the general alignment and connectivity of permanent water, including rivers, lakes, and canals.

Newcastle Libraries wi-fi users

Monthly number of unique users who connected to Newcastle Libraries Wi-Fi from April 2019 to present. Additional notes No login is required for the Wi-Fi; users do not need to be library...

PC and laptop logins

This dataset shows all PC and laptop logins for Leeds City Council staff at all its main locations broken down hourly. For Information --------------- * AP indicates Access Point, which is...

Road Node

A point spatial object that is used to break up the road network for connectivity. The road network splits for the following circumstances: The location where an attribute recorded on the Road Link...

Choice Based Lettings Bids

The data shows property and bid information for homes advertised by the London Borough of Camden on the Home Connections website.

Electric Vehicle Charging Transactions

Data showing Electric Vehicle Charging Point Transactions: charging point location, time, total Wh and connect time. Data measured in Watt Hours (Wh).

Ipswich Borough Council - Existing Playing Field

Existing playing fields which act as stepping stones to improve connectivity between core areas enabling species to move, feed, disperse, migrate or reproduce.