Search directory

Filter by

457 results found

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 03: Design Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 01: Programme Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 08: Consents and Permitting Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 09: Stakeholder Profiling Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 02: FEED Cost Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapters 01 - 03: Executive Summary

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 11: Lessons Learned Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

1992 Institute of Offshore Engineering, Blue Lagoon, Poole Harbour Dorset, Intertidal survey with special reference to Nematostella vectensis

Survey run by the Institute of Offshore Engineering for English Nature (Peterborough). All these records relate to "Sheader, Sheader (1992) - A survey of Blue Lagoon, Poole Harbour, with special...

1992 Institute of Offshore Engineering, Blue Lagoon, Poole Harbour Dorset, Intertidal survey with special reference to Nematostella vectensis

Survey run by the Institute of Offshore Engineering for English Nature (Peterborough). All these records relate to "Sheader, Sheader (1992) - A survey of Blue Lagoon, Poole Harbour, with special...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 06: Health, Safety and Environment Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

July19 Spend over £25,000 in Imperial College Healthcare NHS Trust

A monthly updated list of all financial transactions spending over £25,000 made by ICHNT, as part of the Government's commitment to transparency in expenditure.

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 04: End to End CCS Chain Operations Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Polluted Troposphere TORCH1: Tropospheric ORganic CHemistry Experiment (TORCH1) Ground-based Atmospheric Components Measurements Collection at Writtle College as part of the Polluted Troposphere Programme

The Polluted Troposphere Programme was a 5-year NERC thematic research programme which was centred upon the study of polluted boundary layer air and its transport to the free troposphere. The...

Polluted Troposphere TORCH1: Tropospheric ORganic CHemistry Experiment (TORCH1) Ground-based Atmospheric Components Measurements Collection at Writtle College as part of the Polluted Troposphere Programme

The Polluted Troposphere Programme was a 5-year NERC thematic research programme which was centred upon the study of polluted boundary layer air and its transport to the free troposphere. The...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 07: Risk Management Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

National College for Teaching and Leadership School Leader Programme Application and Participation Data

Data relating to individual members of NCTL including applications for programmes and records of participation and completion of programme modules etc.

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 04: Project Design

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 08: Health and Safety

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 10: Project Management Reports

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 09: Environment and Consent

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...