Important

We're planning improvements to this service. Help us learn what to change by completing a short survey.

Search results

Filter by

Remove filters

797 results found

Locality Reach Areas of Public Amenities

The public amenities reach areas covers a range of public facilities and which locality jurisdiction they fall into. Included are the postcodes in those reach areas. Please find the link to...

Sustainable Urban Extensions (2023)

Polygon dataset showing Sustainable Urban Extensions.

Thanet Extension Site Boundary and Cable Corridor

A polygon file representing the Thanet Extension Wind Farm Site Boundary and Offshore Export Cable Corridor

Thanet Extension Site Boundary and Cable Corridor

A polygon file representing the Thanet Extension Wind Farm Site Boundary and Offshore Export Cable Corridor

Pupil attainment: % reaching Level 2 and 3 by age 19

Proportion of people studying in a local authority at age 15-19 that reach the level 3 threshold, by age and cohort Source: Department for Education and Skills (DfES), Learning and Skills Council...

Calverton Neighbourhood Plan - North West Quadrant Urban Extension

Calverton Neighbourhood Plan - North West Quadrant Urban Extension

LP Minerals Area of Preferred Extension to Existing Salt Mine

Area of Preferred Extension to Existing Salt Mine

LP Minerals Area of Preferred Extension to Controlled Brine field

Area of Preferred Extension to Controlled Brine field

Settlement Extensions

Refer to the Purbeck District Local Plan (November 2012) Policies CEN/NE

DEFRA Survey on impacts on businesses of REACH (Registration, Evaluation, Authorisation and Restriction of Chemicals)

The Defra REACH Business Impacts Survey was designed to provide Defra with information about the impact of the EU REACH Regulation on UK businesses after the first registration deadline of 30...

LP Minerals Area of Preferred Extension for Sand and Gravel Extraction

Area of Preferred Extension for Sand and Gravel Extraction

LP Minerals Area of Preferred Extension to Existing Silica Sand Quarry

Area of Preferred Extension to Existing Silica Sand Quarry

Childrens centre reach areas

Catchment areas for individual Childrens Centres.

Immigration Statistics: extensions of stay

This release replaces the previous annual and quarterly publications Control of Immigration Statistics and the annual British Citizenship, following a public consultation. Each topic now has its...

Hampshire Avon: Vertical head gradient, saturated hydraulic conductivity and pore water chemistry data from six river reaches

This dataset contains measurements of hydraulic head and saturated hydraulic conductivity together with porewater chemistry from banks and riverbed sediments in six river reaches of contrasting...

Absolute gap in % of children who reach expected level of development at 2-2.5 years of age between highest and lowest York ward (4 yr aggregated)

Absolute gap in % of children who reach expected level of development at 2-2.5 years of age between highest and lowest York ward (4 yr aggregated)

Exceptions to Cross-Government moratoria on spend on new property leases and extensions in the Home Office: spend control data

Details of exceptions to the government's moratorium on third-party spend on new property leases and extensions at the Home Office.

National Parks - Lake District & Yorkshire Dales extension

National Parks are run by National Park Authorities for the purpose of conserving and enhancing the natural beauty, wildlife and cultural heritage and to provide opportunities for the understanding...

Maritime and Coastguard Agency (MCA) Bathymetric Survey HI1429, Dover TSS Extension Area, (14/06/2014 to 29/06/2014)

Samples and associated geological data are held at the British Geological Survey for Maritime Coastguard Agency (MCA), Civil Hydrography Programme (CHP), Bathymetric Survey HI1429; Dover TSS...

Performance Dashboard Applications for Section 36 consents, required for the construction, extension or operation of electricity generating stations

This dashboard shows information about how the Applications for Section 36 consents, required for the construction, extension or operation of electricity generating stations service is currently...