Search directory

Filter by

451 results found

UKGEOS Glasgow Construction Phase Groundwater Chemistry Data Release

The data release includes groundwater chemistry data from 8 samples and 2 tap water samples collected during the borehole construction phase at the UK Geoenergy Observatories (UKGEOS) Glasgow...

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1ES, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1ES, 30.04.14. Grant number: UKCCSRC-C1-40.

2012-2013, E.ON, Humber Gateway Offshore Wind Farm, Pre-Construction Ornithological Monitoring Plan (OMP)

The Humber Gateway Project Marine Licence required pre-construction ornithological surveys to take place in the year preceding construction. The pre-construction OMP took place between January 2012...

UKCCSRC Call 1 Project: FleCCSnet - Flexible CCS Network Development

This project will produce and disseminate the first design and operating guidelines for the flexible operation of CCS pipeline networks. The research will explore how CCS pipeline networks can...

Wales Construction and Demolition waste arisings survey 2019

The purpose of the study was to provide information on the types, quantities, origins (by Construction and Demolition sector and geographic region), and fate (management method) of Construction and...

Wales Construction and Demolition waste arisings survey 2019

The purpose of the study was to provide information on the types, quantities, origins (by Construction and Demolition sector and geographic region), and fate (management method) of...

Flexible Resourcing Records

Recruitment - matching skills profiles and availability to identify candidates with the right skills.

Flexible Deployment Tool

Timesheet allocation of hours on variety of projects. Competency Self-Assessments. Only name, position and time allocations & self-assessments held within.

UKCCSRC Call 2 project poster: Towards more flexible power generation with CCS, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 2 project, Towards more flexible power generation with CCS, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C2-214.

Plant-pollinator interactions database for construction of potential networks

Plant-pollinator interactions database derived from biological recording data, unpublished experimental data and published interactions in books and papers. The database covers all recorded...

UKCCSRC Call 2 project poster: Flexible CCS operations combined with online solvent monitoring: A pilot-scale study, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Flexible CCS operations combined with online solvent monitoring: A pilot-scale study was presented at the CSLF Call project poster reception, London,...

UKCCSRC Call 1 project paper: Operational flexibility options in power plants 1 with integrated post-combustion capture

Flexibility in power plants with amine based carbon dioxide (CO2) capture is identified in the literature as a way of improving power plant revenues. Despite the prior art, the value of flexibility...

VOA Non domestic rating - Receipts/expenditure and costs of construction

Non-Domestic Rating data, including receipts/expenditure and costs of construction. Property attribute and transactions data underpin the information base necessary for the VOA to value properties...

VOA Non domestic rating - Receipts/expenditure and costs of construction

Non-Domestic Rating data, including receipts/expenditure and costs of construction. Property attribute and transactions data underpin the information base necessary for the VOA to value properties...

Estimated re-use, recycling and disposal of hard construction and demoltion and excavation waste by region

Estimated re-use, recycling and disposal of hard construction and demoltion and excavation waste by region

Atlas - Construction Industry Tax

Finance & Audit

UKCCSRC Call 1 project reports: Developing CO2 networks: Information from the First Flexible CCS Network Development (FleCCSnet) project workshop

This data contains the output from the first Flexible CCS Network Development (FleCCSnet) workshop of stakeholders discussing the development of CO2 networks in the UK. The first was held on the 30...

2017-2018 Jon Ford Environmental Consultancy Kentish Flats Extension Offshore Wind Farm Post Construction Bird Surveys

This report presents the results of the bird monitoring programme that has been undertaken between October 2017 and March 2018, and summarises the overall results from that programme....

Your Reward Flexible Benefits System

Information held on Your Reward system covers staff names, staff number, location, age, grade, start date, work status, salary, contract hours, tax code and NI, benefits selected and costs. Payroll...

UKCCSRC Call 1 project poster: Flexible CCS Network Development (FleCCSnet), CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Flexible CCS Network Development (FleCCSnet) was presented at the CSLF Call project poster reception, London, 27.06.16. Grant number: UKCCSRC-C1-40. The...