Search directory

Filter by

522 results found

UKCCSRC Call 2 project poster: Novel reductive rejuvenation approaches for degraded amine solutions from PCC in power plants, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Novel reductive rejuvenation approaches for degraded amine solutions from PCC in power plants was presented at the CSLF Call project poster reception,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 10: CCS Project Costs Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 01: Programme Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 09: Stakeholder Profiling Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 06: Health, Safety and Environment Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 04: End to End CCS Chain Operations Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 03: Design Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

2024, Natural Power Consultants Ltd, Thanet Offshore Wind Farm, Benthic Survey

Within the Environmental Statement (ES) for the development of the Thanet OWF, Thanet Offshore Wind Limited committed to undertaking three post-construction monitoring surveys over a ten-year...

Protected Sites - Proposed Deep Sea Marine Reserve - West of Scotland

The West of Scotland MPA was designated on 9th October 2020. The final version is hosted by NatureScot on Natural Spaces: http://gateway.snh.gov.uk/natural-spaces/index.jsp The Scottish Government...

UKCCSRC Call 1 Project: Chemical looping for low-cost oxygen production and other applications

While chemical looping (combustion, CLC) is a promising technology for carbon capture, however many questions still remain as to its applicability at an industrial scale. In Chemical looping...

In year Business Forecast Reviews

Actual P&L, Manpower, Demand information and forward forecast

In Year Monthly Management Accounts

Actual P&L information and forward forecast with workings

IRMS (Import Risk Management System)

Excel spreadsheet used for the central collation of importation figures, forwarded by each regional Animal Health and Veterinary Laboratories Agency (AHVLA) Office.

GLA Survey Results: Private Hire Vehicle Regulations

Complementing Transport for London’s own consultation on changes to regulations for Private Hire Vehicles, over 850 Talk London members participated in a survey to understand their views of the...

Planned Procurement Q1-Q3 2014-15

A forward look incorporating details of invitations to tender or invitations to quote that are likely to be issued in the next 12 months.

Planned Procurement Q4 2014-15

A forward look incorporating details of invitations to tender or invitations to quote that are likely to be issued in the next 12 months.

Hackney Estate Renewal

Approved initial investment to bring forward the Council's ambition to improve both the quality and number of homes available in the borough through an estate renewal programme.

Estate Renewal

Approved initial investment to bring forward the Council's ambition to improve both the quality and number of homes available in the borough through an estate renewal programme.

Operation of police powers under the Terrorism Act 2000 and subsequent legislation: quarterly data on outcomes and stops & searches Great Britain

Quarterly data on the number of terrorism arrests, outcomes of terrorist arrests, principal offences for which terrorism suspects charged and time (in days) from arrest to charge or release of...

Home Office Annual Report

The annual report sets out the vision and priorities of the department over the past year, including progress against our priorities, and also sets out what the aims of the department are going...