Search directory

Filter by

48 results found

Survey : TELL/12/1962 (part of CEFAS Historic surveys)

This survey was undertaken by Cefas as part of the CEFAS Historic surveys; Station and biological data collected during research surveys carried out by Cefas (formerly Directorate of Fisheries)...

Survey : CORE/03/1974 (part of CEFAS Historic surveys)

This survey was undertaken by Cefas as part of the CEFAS Historic surveys; Station and biological data collected during research surveys carried out by Cefas (formerly Directorate of Fisheries)...

Survey : TELL/12/1962 (part of CEFAS Historic surveys)

This survey was undertaken by Cefas as part of the CEFAS Historic surveys; Station and biological data collected during research surveys carried out by Cefas (formerly Directorate of Fisheries)...

End of Life Vehicles - Authorised Treatment Facilities - Public Register

The Environment Agency is responsible for ensuring that Authorised Waste Treatment Facilities (ATF) sites in England comply with current legislation. We monitor permitted ATF sites to ensure they...

Ant colour data from an experiment in Malaysian Borneo, 2015-2018

This dataset measures colour and estimates body size of ant species collected across four vertical strata: subterranean, ground, understory and canopy in lowland tropical rainforest. Ants were...

North of Tyne Local Nature Recovery Strategy - Stage 5

For the Local Nature Recovery Strategy (LNRS) which was adopted in March 2026. This data forms the Stage 5 mapping which identifies “Areas that could become of particular importance”, or ACIBs,...

Soil near-surface properties, vegetation observations, land use and land management information for 1800 locations across the Thames catchment, UK, 2018-2021

This dataset contains information about soil near-surface physical and hydrological properties, vegetation observations and land use & management information across the Thames catchment (UK)....

North of Tyne Local Nature Recovery Strategy - Opportunities in the Wider Countryside

For the Local Nature Recovery Strategy (LNRS) which was adopted in March 2026. This layer represents opportunities for nature recovery within the wider countryside, outside of the measures in Stage...