Search directory

Filter by

1,096 results found

North Lincolnshire Council Local flood risk management strategy - Significant Infrastructure - Nodes

North Lincolnshire Council Local flood risk management strategy - Significant Infrastructure - Nodes represented as points.

North Lincolnshire Council Local flood risk management strategy - Significant Infrastructure - Polygons

North Lincolnshire Council Local flood risk management strategy - Significant Infrastructure - Polygons represented as polygons.

North Lincolnshire Council Local flood risk management strategy - Significant Infrastructure - Nodes

North Lincolnshire Council Local flood risk management strategy - Significant Infrastructure - Nodes represented as points.

North Lincolnshire Council Local flood risk management strategy - Significant Infrastructure - Links

North Lincolnshire Council Local flood risk management strategy - Significant Infrastructure - Links represented as polylines.

AM_S_CheshireEastLocalPlanStrategy_POLY_2010to2030

Polygon data to indicate sites and policies of the Cheshire East Local Plan Strategy 2010-2030

Green Belt Core Strategy 2014 Policy CP8 HISTORIC

Core Strategy adopted 2014 - Policy CP8. Defined the detailed Green Belt within which development is particularly tightly controlled. Areas of reserved open land, mainly around large cities, for...

North of Tyne Local Nature Recovery Strategy - Boundary

For the Local Nature Recovery Strategy (LNRS) which was adopted in March 2026. This defines the strategy's boundary. A combination of the 3 authority areas (Northumberland, Newcastle, and North...

Hastings Local Plan The Hastings Planning Strategy and Development Management Plan

Hastings Local Plan - The Hastings Planning Strategy 2011-2028 AND Development Management Plan planning constraints including Protected Green and Open Spaces and Development Sites. This Polygon...

Number of initiatives in borough's digital strategies for collaboration (data sharing/common standards)

A digital strategy is a plan for focusing and scaling up the benefits to the council, the place, and/or its customers (residents and businesses) of data assets and technology-focused projects and...

Municipal Recycling & Waste Strategy - Assumptions: Economic and Financial Outlook

This section outlines the assumptions we have used as a basis for Barnet Council’s Municipal Recycling & Waste Strategy and the various evidence collated that supports them EO1 - The...

Housing in London - The evidence base for the Mayor's Housing Strategy

The Greater London Authority's ‘Housing in London’ report sets out the evidence base for the Mayor's housing policies, summarising key patterns and trends across a wide range of topics relevant to...

City and Town Centre Shopping Area Core Strategy 2014 Policy CP12

Core Strategy adopted 2014 (Policy CP12) Defines the hierarchy of shopping centres as the principal locations for shopping and community facilities as well as offices, local entertainment, art and...

Interim Percentage of Pupils Making Expected Progress in English and in Mathematics between Key Stage 1 and Key Stage 2 in England

This Statistical First Release (SFR) provides national and local statistics on expected progress of eligible pupils between Key Stage 1 (KS1) and Key Stage 2 (KS2) Source agency:...

Strategy for Industry Generated Data - 2016/17 - Fisheries Science Patnership

A desk-based study was undertaken to address the increasing need for a strategic approach to industry-led data collection in the face of reducing resources and growing need for evidence in...

Bath Enterprise Area Core Strategy 2014 Policies B1 B3 B5

Core Strategy adopted 2014 Policies B1 B3 B5. Defines the boundary of a key area of change within Bath comprising a collection of development opportunity sites and buildings along the river corridor.

WFD RBMP2 Cycle 1 Progress Classification Objectives

This dataset contains cycle 1 classification data from 2009, objectives set in 2009 and 2015 classification data to support the cycle 2 river basin management plans. It contains information on...

Tunbridge Wells Open Data - Transparency - Final Medium Term Financial Strategy 2017-18 to 2021-22

Tunbridge Wells Open Data - Transparency - Final Medium Term  Financial Strategy 2017-18 to 2021-22

EU Project Report: Saline Aquifer CO2 Storage phase 2 (SACS2) : a demonstration project at the Sleipner Field : work area 1 (Geology). Progress report.

Saline Aquifer CO2 Storage Phase 2(SACS2). Work Area 1 (Geology) - Progress Report 1 April to 31 December 2000. The report can be downloaded from http://nora.nerc.ac.uk/511460/.

North of Tyne Local Nature Recovery Strategy - Strategic Recovery Areas

For the Local Nature Recovery Strategy (LNRS) which was adopted in March 2026. Not part of the statutory mapping (refer to the LNRS document for more explanation). This is where there are large...

Northern Ireland Road Safety Strategy to 2020 – Monitoring of Targets and Key Performance Indicators

This is a annual update monitoring the targets and key performance indicators set out in the Northern Ireland Road Safety Strategy to 2020. Source agency: Environment (Northern...