Search directory

Filter by

4,683 results found

Scheduled Ancient Monumnets

Monuments, structures or below ground archaeological sites that are identified as being of national significance are placed on a list or Schedule. If a monument is Scheduled , it means that...

Waste Reduction and Recycling Plans (RRPs)

London Local authorities have developed waste Reduction and Recycling Plans (RRPs) setting out key actions for minimising waste and boosting recycling locally. The RRPs are used to drive and...

Environmental Health Service Requests

Numbers of top level service requests received by the Environmental Health Service. An explanation of each category is also provided. Service requests are split into the following categories: ...

Child Well-being Index (CWI) 2009: Living Environment domain

The Environment Domain captures aspects of the environment that affect children's physical well-being (health, exercise and safe, independent mobility). Indicators of the potential of the natural...

British Geological Survey (BGS) Geophysical Survey 1975/6: Brent Area (18/07/1975 to 28/07/1975)

Report: Deegan, SE. 1975. Cruise Report for survey of the Brent area. MV Aqua Star. MGU Project 75/06. (IGS Report No 61) Navigation: Principal fixing method was by Decca Main Chain, Hordaland...

Local Development Plan 2015 Supplementary Guidance: Spatial Framework for Wind Energy - Argyll and Bute

Renewables Spatial Framework incorporating the Carbon and Peatland map as published by SNH on 30th June 2016

2022, Enquest Heather Ltd, Bressay Field Development, Site Survey, DECC Reference Number GS_1463

An oil and gas industry environmental baseline and geophysical site survey acquired under licences P1078, P1077, P277, P920, P493, P234 in October 2022 to re-validate the significant data EnQuest...

1998, Hess, Flora Development I, Site Survey, BGS Reference Number AH98SS0003

An oil and gas industry geophysical and geotechnical site survey acquired between December and February 1998. The block number traversed was 31/26.

Section 52 and 106 Agreements

Planning obligations (section 52 and 106 agreements) are linked to a planning application decision, made either by the local planning authority or by the Planning Inspectorate in the case of an...

Section 52 and 106 Agreements

Planning obligations (section 52 and 106 agreements) are linked to a planning application decision, made either by the local planning authority or by the Planning Inspectorate in the case of an...

Senior staff salaries

The data includes (in part) the following information. Column names are in brackets: service area code (see key below): used in expenditure returns to central government (Service area) full...

Contract - Cross Council Assurance Service (CCAS) - PwC

The Cross Council Assurance Service (CCAS) is a framework for internal audit, assurance and advisory services that commenced on 1st April 2020 and is led by the London Borough of Barnet. The...

Lambeth Reduction and Recycling Plan

This is the Reduction and Recycling Plan (RRP) for the London Borough of Lambeth.London Local authorities are developing their Reduction and Recycling Plans (RRPs) setting out key actions for...

Enfield Reduction and Recycling Plan

This is the Reduction and Recycling Plan (RRP) for the London Borough of Enfield.London Local authorities are developing their Reduction and Recycling Plans (RRPs) setting out key actions for...

Bexley Reduction and Recycling Plan

This is the Reduction and Recycling Plan (RRP) for the London Borough of Bexley.London Local authorities are developing their Reduction and Recycling Plans (RRPs) setting out key actions for...

City of London Reduction and Recycling Plan

This is the Reduction and Recycling Plan (RRP) for the City of London.London Local authorities are developing their Reduction and Recycling Plans (RRPs) setting out key actions for cutting waste...

Merton Reduction and Recycling Plan

This is the Reduction and Recycling Plan (RRP) for the London Borough of Merton.London Local authorities are developing their Reduction and Recycling Plans (RRPs) setting out key actions for...

NI 092 - Narrowing the gap between the lowest achieving 20% in the Early Years Foundation Stage Profile and the rest

The gap between the median Foundation Stage Profile score of all children locally and the mean score of the lowest achieving 20% of children locally, as a percentage of the median score of all...

Carers Credit Operating System

Carer’s Credit Operating System Database containing details of carers and the disabled person(s) that they care for. The system captures the name, National Insurance Number, date of birth and...

1998, Hess, Flora Development Northern Prince, Site Survey, BGS Reference Number AH98SS0001

An oil and gas industry site survey (ROV and pipeline route) acquired in February 1998. The block numbers traversed was 31/26.