Search results

Filter by

Remove filters

1,469 results found

Enrolments at schools and in funded pre-school education (Northern Ireland)

Enrolments at schools and in funded pre-school education, including breakdown by management type, religion, ethnicity of pupils. Source agency: Education (Northern Ireland) Designation: National...

UKGEOS Glasgow post-drill superficial deposits model

The UK Geoenergy Observatories (UKGEOS) Glasgow superficial deposits GSI3D model outputs, created by the British Geological Survey, provide a semi-regional overview of the depth, thickness and...

York Ward Profiles 2014-15 (pre May 2015 election boundaries)

These are the York ward profiles containing information up to March 2015 on the 22 electoral wards using the __pre May 2015 election boundaries__.

Pre- or post-release probation supervision, by ethnic group

Percentage of persons starting pre- or post-release supervision by the Probation Service, by ethnic group and area Source: Ministry of Justice (MoJ) Publisher: Ministry of Justice Geographies:...

A6 Randalstown to Castledawson Dualling Road scheme pre-works LIDAR

Pre-works LIDAR survey of the topography on the line of the proposed road.

UKGEOS Glasgow post-drill coal mine model

The UK Geoenergy Observatories (UKGEOS) Glasgow 3D coal mine model outputs, created by the British Geological Survey, provide a semi-regional overview of the depth and extent of surveyed and...

Pre Schools

shows the location of childrens services in lambeth

Barrow Borough Local Plan Pre-Submission Draft March 2017

The Barrow Borough Local Plan Pre Submission Draft is now at a stage where the Council considers it is ready for submission to the Secretary of State for independent examination. The Plan will be...

UKGEOS Glasgow post-drill bedrock model

The UK Geoenergy Observatories (UKGEOS) Glasgow bedrock model outputs, created by the British Geological Survey, provide a semi-regional overview of the depth and extent of bedrock...

Average number of days to complete all repairs (excluding pre- inspection time) - (YTD)

Average number of days to complete all repairs (excluding pre- inspection time) - (YTD)

2012-2013, E.ON, Humber Gateway Offshore Wind Farm, Pre-Construction Ornithological Monitoring Plan (OMP)

The Humber Gateway Project Marine Licence required pre-construction ornithological surveys to take place in the year preceding construction. The pre-construction OMP took place between January 2012...

2010, Chevron, Lagavulin, Drilling Hazard Survey, DECC Reference Number 2248

An oil and gas industry site survey for a shallow hazard assessment of a potential drill site acquired under licence P1196 between June and July 2010. The block numbers traversed were 217/10, 217/15.

2017-2018 Jon Ford Environmental Consultancy Kentish Flats Extension Offshore Wind Farm Post Construction Bird Surveys

This report presents the results of the bird monitoring programme that has been undertaken between October 2017 and March 2018, and summarises the overall results from that programme....

Immigration Statistics: extensions of stay

This release replaces the previous annual and quarterly publications Control of Immigration Statistics and the annual British Citizenship, following a public consultation. Each topic now has its...

FIIFIS pre 2007

Database containing details of fatal incidents for PPO investigations before 2007.

2004, EON, Johnston Field Extension, Site Survey, BGS Reference Number EU04SS0001

An oil and gas industry site survey acquired in August 2004 to identify any seabed obstructions and/or sub-surface hazards at the proposed 43/27a-H location that may impede the emplacement and...

Data on glass chips from IDDP-1 (Iceland) drilling project

These are so-called relaxation datasets for the rate of structural relaxation of glass exposed to high temperatures. The glass is in the form of chips collected during the IDDP-1 drilling project...

Drill Fluid Chemistry for GGC01, GGA07, and GGA08

Data set is of drill fluid return, settling tank, and bore hole flush fluids sampled during the development of GGC01 seismic monitoring borehole and GGA07 and GGA08 mine water geothermal wells at...

2010, Apache, Forties Field Note, Drilling Hazard Survey, DECC Reference Number 2155

An oil and gas industry site survey for a drilling hazard acquired under licence P246 in April 2010. The block number traversed was 21/10.

2011, Maersk Oil, Ockley Site Survey, Drilling Hazard Survey, DECC Reference Number 2488

An oil and gas industry drilling hazard site survey acquired in April 2011. The block number traversed was 30/1d.