Filter by
1,475
results found
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
In this study, two strategies, thermal pretreatment and chemical doping, were investigated as a method of improving the residual carrying capacity of Longcliffe and Havelock limestone for calcium...
- Published by:
- Centre for Environmental Data Analysis
- Last updated:
- 19 June 2018
This dataset contains atmospheric profiles from the Michelson Interferometer for Passive Atmospheric Sounding (MIPAS) on Envisat, processed with the Oxford L2 retrieval algorithm MORSE. This...
- Published by:
- Salford City Council
- Last updated:
- 02 September 2021
Premises licences issued by Salford City Council. These are licences issued to premises which sell alcohol, provide regulated entertainment or serve hot food after 11pm.
Dataset is formatted to...
- Published by:
- Centre for Environmental Data Analysis
- Last updated:
- 17 July 2017
This dataset contains atmospheric profiles from the Michelson Interferometer for Passive Atmospheric Sounding (MIPAS) on Envisat, processed with the Oxford L2 retrieval algorithm MORSE. This...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 26 March 2026
Laser ablation trace element data for rutile and apatite were recovered from Mindola and Nchanga. At Mindola the Kitwe Formation is the major host to Cu-Co (copper-cobalt) mineralisation at...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 26 March 2026
U-Pb (Uranium – Lead) geochronology data of rutile from the Mindola Deposit Zambia Copperbelt. Full U/Pb isotope data, uncertainties and calculated ages for individual spot analyses for each sample...
- Published by:
- Environmental Information Data Centre
- Last updated:
- 14 May 2026
Data collected during field and laboratory experiments to investigate the long-term effects of biochar application to soil on greenhouse gas emissions in a bioenergy plantation (Miscanthus X....
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
Multibeam data acquired on transit between GT stations collecting bathymetry and backscatter to client specifications, WGS84 latitude and longitude co-ordinates collected by Differential Global...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
The Borzęcin natural gas reservoir has been producing gas since the 1970s. The natural gas reservoir is located in the Zielona Góra basin, in the Polish part of the European Permian Basin. The...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...