Search directory

Filter by

3,013 results found

OSNI Open Data: River Basin LIDAR 2008 - DTMs and DSMs

Terrain (DTM) & Surface (DSM) elevation models of river basins derived from airborne LIDAR survey systems. A Digital Terrain Model (DTM) is a digital file consisting of a grid of...

OSNI Open Data: River Basin LIDAR 2004 - DTMs and DSMs

Terrain (DTM) & Surface (DSM) elevation models of river basins derived from airborne LIDAR survey systems. A Digital Terrain Model (DTM) is a digital file consisting of a grid of...

OSNI Open Data: River Basin LIDAR 2007 - DTMs and DSMs

Terrain (DTM) & Surface (DSM) elevation models of river basins derived from airborne LIDAR survey systems. A Digital Terrain Model (DTM) is a digital file consisting of a grid of...

OSNI Open Data: River Basin LIDAR 2013 - DTMs and DSMs

Terrain (DTM) & Surface (DSM) elevation models of river basins derived from airborne LIDAR survey systems. A Digital Terrain Model (DTM) is a digital file consisting of a grid of...

OSNI Open Data: River Basin LIDAR 2009 - DTMs and DSMs

Terrain (DTM) & Surface (DSM) elevation models of river basins derived from airborne LIDAR survey systems. A Digital Terrain Model (DTM) is a digital file consisting of a grid of...

Waste Data Interrogator 2009

All operators of regulated waste management facilities have to provide us with details of the quantities and types of waste they deal with i.e. waste received into site and waste sent on from site...

OSNI Open Data: River Basin LIDAR 2010 - DTMs and DSMs

Terrain (DTM) & Surface (DSM) elevation models of river basins derived from airborne LIDAR survey systems. A Digital Terrain Model (DTM) is a digital file consisting of a grid of...

Waste Data Interrogator 2010

All operators of regulated waste management facilities have to provide us with details of the quantities and types of waste they deal with i.e. waste received into site and waste sent on from site...

Waste Data Interrogator 2006

All operators of regulated waste management facilities have to provide us with details of the quantities and types of waste they deal with i.e. waste received into site and waste sent on from site...

Waste Data Interrogator 2007

All operators of regulated waste management facilities have to provide us with details of the quantities and types of waste they deal with i.e. waste received into site and waste sent on from site...

Waste Data Interrogator 2008

All operators of regulated waste management facilities have to provide us with details of the quantities and types of waste they deal with i.e. waste received into site and waste sent on from site...

Input to Yield Ratio (IYR) maps for wheat farming in England, 2010-2017

These maps show the Input to Yield Ratio (IYR) of wheat farming in England, calculated as the ratio of agrochemical inputs to agricultural reward as yield. We assess the IYR at a 1km resolution for...

Monthly sampling of riverine chemistry and organic matter for 41 rivers in Great Britain in 2017 as part of the LOCATE project

This dataset contains particulate and dissolved organic carbon concentrations, nutrients (ammonia, nitrates, phosphate), alkalinity, pH, particulate organic nitrogen, delta-C-13 and delta-15-N...

EU Project: CO2CARE - CO2 Site Closure Assessment Research

The CO2CARE (CO2 Site Closure Assessment REsearch) project focused on site closure and preparation for transfer of liability of a CO2 storage project in order to assist regulatory authorities and...

Ipswich Borough Council - Allotments

In 2005 Ipswich Borough Council approved its first Allotment Strategy for all Borough-owned allotment sites in Ipswich. The provision of allotments is a statutory duty, with Local Authorities...

Community Councils - Argyll and Bute

Community councils are required to be established by local authorities. They are the most local tier of statutory representation in Scotland. They bridge the gap between local authorities and...

IPO prompt payment of supplier invoices

In line with Government guidelines issued at the beginning of 2009, the Intellectual Property Office is required to pay 80% of all It's undisputed supplier Invoices within 5 days of receipt. This...

British Household Panel Survey

The main objective of the BHPS is to further understanding of social and economic change at the individual and household level in Britain and the UK. This survey data is available in the UK Data...

DVL_CONSERVATION_AREAS

A conservation area is an area of special architectural or historic interest or might add to the character of an area. Conservation areas are protected and some areas have more planning...

Manchester Pay Policy Statement

This document contains the requirements as set out in the Local Government Transparency Code in relation to the Pay Multiple. The Pay Multiple is included in this document. The pay multiple is...