Search directory

Filter by

5,004 results found

GPS OJEU Sourcing performance turnaround times

Monthly average turnaround times of OJEU procurements carried out by by GPS (from advert to contract award)

UKCCSRC Call 2 project poster: Performance of Flow Meters with Dense Phase CO2 and CCS Recovery Streams, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Performance of Flow Meters with Dense Phase CO2 and CCS Recovery Streams was presented at the CSLF Call project poster reception, London, 27.06.16. Grant...

UKCCSRC Call 2 Project: Process-performance indexed design of task-specific ionic liquids for post-combustion CO2 capture

Increased population and increased economic activity have one important thing in common: increased energy demand. More and more, concern is mounting surrounding the broader environmental impact...

UKCCSRC Call 2 project poster: Process-Performance Indexed Design of Ionic Liquids for Carbon Capture, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Process-Performance Indexed Design of Ionic Liquids for Carbon Capture was presented at the CSLF Call project poster reception, London, 27.06.16. Grant...

UKCCSRC Call 2 project data: Performance of Flow Meters with Dense Phase CO2 and CCS Recovery Streams

Fiscal metering could face several challenges during CO2 transport by pipelines due to the unusual physical properties of CO2 and CO2 mixtures. Coriolis flowmeters are an options to measure CO2...

Conservation and development investments in the Corridor Ankeniheny-Zahamena (CAZ), Madagascar, 2007-2014

Conservation and development investments in the Ankeniheny-Zahamena Corridor (CAZ) includes information on investment type, implementing agency, and timing and location of investments. Data were...

Domestic Energy Performance Certificates Lodged on Register - By Energy Efficiency Rating

The release covers certificates lodged between 2008 and Q4, 2015, and breaks the data down for each specified calendar quarter (Q1=Jan-Mar, Q2=Apr-Jun, Q3=Jul-Sep, Q4=Oct-Dec) within each specified...

Flood risk assessment of the Luanhe river basin under different development strategies and climate scenarios

The dataset describes the data needed for and results produced by the flood risk assessment framework under different development strategies of Luanhe river basin under a changing climate. The...

Comparative performance of rural water supplies during drought - dataset (NERC grant NE/R000069/1)

Ethiopia experienced severe drought in 2015-16. Many rural communities experienced declines in the performance of their water supply systems. As a result UNICEF commissioned a real-time monitoring...

UKCCSRC Call 2 project poster: Performance of Flow Meters with Dense Phase CO2 and CCS Recovery Streams, Cardiff Biannual, 10.09.14

This poster on the UKCCSRC Call 2 project, Performance of Flow Meters with Dense Phase CO2 and CCS Recovery Streams, was presented at the Cardiff Biannual, 10.09.14. Grant number: UKCCSRC-C2-201.

Rural Areas within Local Enterprise Partnerships (Rural Development Programme) (England)

Rural areas within Local Enterprise Partnership boundaries (an interpretation by Defra given available information) and Built-Up Area geographies from the Office for National Statistics. This...

UKCCSRC Call 2 Project: Performance of Flow Meters with Dense Phase CO2 and CCS Recovery Streams

Carbon Capture and Storage (CCS) technologies are critical for the UK to achieve its an ambitious target to reduce CO2 emissions by 80% by 2050. The development of an accurate, cost efficient and...

ECLIPSE 100 Input decks for reservoir models developed as part of CO2MULTISCALE

UKCCSRC Call 2 Project C2-197 - The dataset comprises a series of ECLIPSE 100 input decks describing reservoir models of potential CO2 storage sites in the Southern North Sea and East Irish Sea...

Overseas Development Assistance (ODA) International Subscriptions

This file gives details of FCO Core Contributions to International Organisations.

Official Development Assistance (ODA) International Programme

FCO International Programme superceeded the previous programme fund, the FCO Bilateral and Strategic programme fund. These datasets are cumulative and are added to quarterly.

PlanMK 2016 - 2031 Development Boundary

City boundary for Milton Keynes. Taken from Milton Keynes Local Plan 2016 - 31

DWP Sustainable Development Annual Report 2009

The Report provides a summary of DWP progress towards Governmnet targets and mandates.

DWP Sustainable Development Annual Report 2008

The Report provides a summary of DWP progress towards Governmnet targets and mandates.

Adopted 2018 Local Plan Development Boundary

Upon accessing this Licensed Data you will be deemed to have accepted the terms of the Open Government Licence for Public Sector Information Contains OS data © Crown copyright and database rights...

Limits to Built Development (STR 1)