Filter by
275
results found
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
This project aims to build on and strengthen joint industry research programmes between Edinburgh, Doosan Power Systems in the UK and Sulzer ChemTech, a world leading manufacturer of separation...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
This poster on the UKCCSRC Call 2 project Towards more flexible power generation with CCS was presented at the UKCCSRC Manchester Biannual Meeting, 13.04.2016. Grant number: UKCCSRC-C2-214.
- Published by:
- London Borough of Camden
- Last updated:
- 14 September 2023
This dataset contains a list of locations and what day of the week they are cleaned. A 1 indicates cleansing on that day, not the frequency of cleansing; a 2 or more indicates frequency.
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
The inherent nature of electricity necessitates a permanent balance between generation and demand in electricity systems. This has obvious implications for the operation of CCS power plants in...
- Published by:
- HM Revenue and Customs
- Last updated:
- 30 August 2013
No. of cases required compared to the no. issued. Updated: monthly.
- Published by:
- London Borough of Barnet
- Last updated:
- 28 May 2026
A legal agreement, known as a Principal Development Agreement (PDA) between Barnet Council, developer Countryside and housing provider L&Q was signed to pave the way for a 616-home regeneration...
- Published by:
- Scottish Government SpatialData.gov.scot
- Last updated:
- 19 June 2024
The main use of the Land Capability Classification for Forestry is as an aid to decision-making at broad planning levels, as a guide for land managers and as a statement of the natural resources of...
- Published by:
- City of York Council
- Last updated:
- 12 May 2025
PLEASE NOTE THAT THESE SCHEDULES ARE NO LONGER VALID, BUT ARE KEPT IN THE PLATFORM FOR HISTORIC PURPOSES.
Details of the previous - before 1 August 2016, and proposed - after 1 August...
- Published by:
- City of York Council
- Last updated:
- 12 May 2025
PLEASE NOTE THAT THESE SCHEDULES ARE NO LONGER VALID, BUT ARE KEPT IN THE PLATFORM FOR HISTORIC PURPOSES.
Details of the previous - before 1 August 2016, and proposed - after 1 August 2016, manual...
- Published by:
- Department for Business, Energy and Industrial Strategy
- Last updated:
- 12 August 2013
Underlying data from the impact assessments underlying the consultation on modern workplaces [URN 11/699] Underlying data from the impact assessments: Underlying data from the publication Working...
- Published by:
- Cheshire West and Chester Council
- Last updated:
- 09 September 2021
Archaeological sites and monuments of national importance are designated as Scheduled Monuments under Part l of the Ancient Monuments and Archaeological Areas Act 1979...
- Published by:
- Cheshire West and Chester Council
- Last updated:
- 09 September 2021
Archaeological sites and monuments of national importance are designated as Scheduled Monuments under Part l of the Ancient Monuments and Archaeological Areas Act 1979...
- Published by:
- Cheshire East Council
- Last updated:
- 09 September 2021
Archaeological sites and monuments of national importance are designated as Scheduled Monuments under Part l of the Ancient Monuments and Archaeological Areas Act 1979...
- Published by:
- Cheshire East Council
- Last updated:
- 09 September 2021
Archaeological sites and monuments of national importance are designated as Scheduled Monuments under Part l of the Ancient Monuments and Archaeological Areas Act 1979...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
This dataset relates to the scientific journal article "A pilot-scale study of dynamic response scenarios for the flexible operation of post-combustion CO2 capture" (Tait et al. 2016), a study...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
UKCCSRC Flexible Funding 2020. Experimental data are the acoustic emission (AE) signals collected with three AE sensors when CO2 leak from a CO2 storage cylinder under different pressures....
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 25 June 2026
UKCCSRC Call 2 Project C2-214 . The dataset consists of six excel spreadsheets containing data from six dynamic operating scenarios for post-combustion CO2 capture on coal, implemented at the...
- Published by:
- Leeds City Council
- Last updated:
- 04 August 2021
Effective, well maintained grids and inlets to culverts are an essential flood prevention measure. The Flood Risk Management section implements a maintenance schedule, clearing grids of debris at...
- Published by:
- OpenDataNI
- Last updated:
- 19 February 2016
Scheduled bus timetable information at geo referenced bus stop level.
- Published by:
- Basildon Borough Council
- Last updated:
- 03 January 2018
This dataset shows the planning development constraints for Scheduled Ancient Monuments from 2011.