Search results

Filter by

Remove filters

1,474 results found

Modern workplaces consultation: government response on flexible working. Impact assessment

Data supporting the impact assessment for proposals to extend the right to request flexible working to all employees. These proposals aim to facilitate the employee-employer information exchange...

Modern workplaces [consultation]: government response on flexible parental leave. Impact assessment.

Data supporting the impact assessment for proposals on extending flexible parental leave in the closed consultation on modern workplaces (URN 11/699). The new system of flexible parental leave aims...

Hackney Article 4 Directions - Flexible Town Centre Use

Article 4 Direction (A4D) is part of planning legislation that allows the Council to remove permitted development rights including changes of use from an area or a particular property. This dataset...

Seagrass Potential

Summary Seagrass Potential v3 Summary: A majority of the seagrass potential areas are derived from wave and current energy, elevation and salinity criteria. Some 'Additional' areas have been...

Potential Contaminated Land

Any Potential Contamination on Land

Potential Development Sites

Potential Development Sites as identified in Local Plans

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Update, 06.03.14

This is a blog (Update, 06.03.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

ABC_ArchaeologicalPotential

This is an extract of ArcGIS created polygons showing areas of archaeological potential in the borough of Ashford, Kent.

Potentially Contaminated Land

Carlisle City Council Potentially Contaminated Land. Upon accessing this Licensed Data you will be deemed to have accepted the terms of the Public Sector End User Licence - INSPIRE

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Workshop1, 30.04.14

This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

Potential New Open Spaces

Potential new open land resources.

Potentially Violent Persons Database

Details of potentially violent welfare customers

WWNP Riparian Woodland Potential

This dataset has been produced as part of the Mapping Potential for Working with Natural Processes research project (SC150005). The project created a toolbox of mapped data and methods which enable...

WWNP Floodplain Reconnection Potential

This dataset has been produced as part of the Mapping Potential for Working with Natural Processes research project (SC150005). The project created a toolbox of mapped data and methods which enable...

WWNP Floodplain Woodland Potential

This dataset has been produced as part of the Mapping Potential for Working with Natural Processes research project (SC150005). The project created a toolbox of mapped data and methods which enable...

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1ES, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1ES, 30.04.14. Grant number: UKCCSRC-C1-40.