Search directory

Filter by

1,221 results found

basildon_cs2012_majorurbanarea

The dataset was used in the development of the Core Strategy 2012 and shows the rough boundaries of Major Urban Area of Basildon...

Green Corridors

River and canal banks, cycle ways and rights of way, for walking, cycling, or horse riding, whether for leisure or travel, and opportunities for wildlife migration. This dataset is currently under...

Public Rights of Way

Dataset showing the Public rights of way (ROW) within the Knowsley Borough Council Boundry. The dataset is used to show the centre lines of the definitive rights of way on the site...

sea_amenity_sites_2008

The sustainable environmental assessment defined where development within Basildon Borough met other developments. This layer isolated the known amenity sites for this period...

Protected Hedgerows

Dataset showing Protected Hedgerows as identified in the Protected Hedgerows Act 1997 (Regulation 5,1,A), record as a polyline. Upon accessing this Licensed Data you will be deemed to have accepted...

Rights Of Way - Byways Open To All Traffic

Byways open to all traffic, a category of Public Rights of Way. The precise legal line of a right of way can only be determined by reference to the Definitive Map (1:10560 scale). Cheshire West...

SNPA - ELDP land with consent for 10 or more houses

Dataset showing land with existing commitments for 10 or more houses at the time of publication, 2011, under Strategic Policy G - Housing of the Eryri Local Development Plan (ELDP), the limit of...

SNPA - ELDP areas safeguarded for minerals

Dataset showing the areas of mineral resources to be safeguarded from permanent sterilisation by development under Strategic Policy E - Minerals Safeguarding of the Eryri Local Development Plan...

Burnley Conservation Areas

There are presently ten conservation areas in Burnley as follows: Jib Hill, Hurstwood, Padiham, Palatine, Harle Syke, Worsthorne, Burnley Wood Canalside, Burnley Town Centre, Top O’ T’ Town Upon...

Fareham Local Plan 2037 Policies Map (Adopted April 2023)

The Fareham Local Plan 2037 (adopted April 2023) contains strategic priorities, policies and allocations which aim to achieve sustainable development in the Borough whilst also identifying and...

Leeds schools energy costs

**This data set is no longer updated. The information it contains is included in the** [**council energy consumption data set.**](https://datamillnorth.org/dataset/council-energy-consumption) ...

Rail Timetables

This timetable data is updated on a weekly basis and contains all national rail passenger train services, associated shipping and bus links, as well as reference data to support timetable enquiry...

Assets of Community Value

The Council must introduce and administer a scheme which makes provision for local community groups to nominate buildings or land within the district to be included in a List of Assets of Community...

Joint recommendations (Prisons and Probation Ombudsmen)

Joint Reccomendations Database used in the Prison and Probations Ombudsman. Reccomendations refer to services (Prison Service, Probation Service, Home Office Immigration Enforcement) that are made...

basildon_cs2012_padc6

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

Article 4 Directions

Article 4 Direction (ART4). Serves to restrict permitted development rights, which means that a lot of the things people do to their land or houses without planning permission and often take for...

basildon_cs2012_padc10

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc1

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc12

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc11

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...