Search results

Filter by

Remove filters

862 results found

Annual CO2 emissions relating to water use in an average home built before 1990

Annual CO2 emissions relating to water use in an average home built before 1990

York Ward Profiles 2014-15 (pre May 2015 election boundaries)

These are the York ward profiles containing information up to March 2015 on the 22 electoral wards using the __pre May 2015 election boundaries__.

Pre- or post-release probation supervision, by ethnic group

Percentage of persons starting pre- or post-release supervision by the Probation Service, by ethnic group and area Source: Ministry of Justice (MoJ) Publisher: Ministry of Justice Geographies:...

A6 Randalstown to Castledawson Dualling Road scheme pre-works LIDAR

Pre-works LIDAR survey of the topography on the line of the proposed road.

Pre Schools

shows the location of childrens services in lambeth

Built-up Areas (March 2011) Names and Codes in EW

A names and codes file for built-up areas in England and Wales as at 27 March 2011 (Census day). File Size 169KB.REST URL of Feature Access Service –...

Barrow Borough Local Plan Pre-Submission Draft March 2017

The Barrow Borough Local Plan Pre Submission Draft is now at a stage where the Council considers it is ready for submission to the Secretary of State for independent examination. The Plan will be...

Major Towns and Cities and Built-up Areas Swipe Map

How would you define the boundaries of a town or city in England and Wales in 2016? Maybe your definition would be based on its population size, geographic extent or where the industry and...

UKGEOS Glasgow pre-drill coal mine model

The UK Geoenergy Observatories (UKGEOS) Glasgow 3D coal mine model outputs, created by the British Geological Survey, provide a semi-regional overview of the depth and extent of surveyed and...

Average number of days to complete all repairs (excluding pre- inspection time) - (YTD)

Average number of days to complete all repairs (excluding pre- inspection time) - (YTD)

2012-2013, E.ON, Humber Gateway Offshore Wind Farm, Pre-Construction Ornithological Monitoring Plan (OMP)

The Humber Gateway Project Marine Licence required pre-construction ornithological surveys to take place in the year preceding construction. The pre-construction OMP took place between January 2012...

Built-up Area (2011) to Region (December 2011) Lookup in EW

A lookup between built-up areas and regions as at 31 December 2011 in England and Wales (File Size 368KB).REST URL of Feature Access Service –...

Built-up Areas (December 2022) Names and Codes in EW

A names and codes file for built-up areas in England and Wales as at 1st December 2022. (File Size 616 KB).Field Names - BUA22CD, BUA22NM, BUA22NMWField Types - Text, Text, TextField Lengths - 9,...

FIIFIS pre 2007

Database containing details of fatal incidents for PPO investigations before 2007.

Built-up Areas Web map

{{description}}

Built-up Area Sub Divisions (March 2011) Names and Codes in EW

A names and codes file for built-up area sub-divisions in England and Wales as at 27 March 2011 (Census day). File Size 54KB.REST URL of Feature Access Service –...

Built-up Areas (April 2024) Names and Codes in EW

A names and codes file for built-up areas in England and Wales as at 17th April 2024. (File Size 191 KB).Field Names - BUA24CD, BUA24NM, BUA24NMWField Types - Text, Text, TextField Lengths - 9, 54, 33

GlaciStore: Cover sheet to pre-proposal to IODP, UK CCS RC Call 1 (31 March 2014)

Pre-proposal cover sheet for scientific drilling 'GlaciStore: Understanding Late Cenozoic glaciation and basin processes for the development of secure large-scale offshore CO2 storage (North Sea)',...

Built-up Area Sub Division (2011) to Region (December 2011) Lookup in EW

A lookup between built-up area sub-divisions and regions as at 31 December 2011 in England and Wales (File Size 115KB).REST URL of Feature Access Service –...

GlaciStore: pre-proposal to IODP, UK CCS RC, Call 1 (31 March 2014)

Pre-proposal for scientific drilling 'GlaciStore: Understanding Late Cenozoic glaciation and basin processes for the development of secure large-scale offshore CO2storage (North Sea)', submitted to...